| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.1 LAccepted-AOC 27 2 1ST MAIN ROAD GOKULA 1ST STAGE 1ST PHASE BANGALORE 560054 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560054 | L1 | Accepted-AOC Bidder quoted L1 rates | |
| 2 | L2₹84.5 L+₹3.7 L (4.53%)Rejected-Finance | L2 | Rejected-Finance Bidder not quoted L1 rates | |
| 3 | L3₹88.8 L+₹8.0 L (9.89%)Rejected-Finance PLOT NO 76 CIV SOCIETY MUKUND NAGAR AHMEDNAGAR 414001 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414001 | L3 | Rejected-Finance Bidder not quoted L1 rates | |
| 4 | L4₹93.9 L+₹13.1 L (16.2%)Rejected-Finance | L4 | Rejected-Finance Bidder not quoted L1 rates | |
| 5 | Rejected-Technical 54 10 SHANTI NAGAR NEAR SHINDE CHATRI WANAVADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | - | Rejected-Technical Due to CIC Pending and valid reqd docs for unenlisted contractor not uploaded. |
| Sl No | Description | Qty | Unit | George Electricals L1 | Parhar Enterprise L4 | L.T Associate L2 | HG PATHAN CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | B&R PORTION
Dismantling single layer Mangalore pattern or similar tiles in roofing complete all as specified and as directed.
(Note : Contractor's quoted rate shall deemed to be inclusive for making good disturbed portion if any & nothing extra will be admissible on this account.) | 1,137 | SQM | 10 ₹11,370 Lowest | 10 ₹11,370 Lowest | 25 ₹28,425 | 10 ₹11,370 Lowest |
| 2.00 | Dismantling single layer Mangalore pattern or similar tiles in roofing portions bedded in lime or cement mortar, complete all as specified and as directed.
(Note : Contractor's quoted rate shall deemed to be inclusive for making good disturbed portion if any & nothing extra will be admissible on this account.) | 74 | SQM | 15 ₹1,110 | 10 ₹740 Lowest | 25 ₹1,850 | 12 ₹888 |
| 3.00 | Dismantling battens for tiles, shingles etc of any size including tilting fillets, spaced exc. 15 cm, complete all as specified and as directed.
(Note : Contractor's quoted rate shall deemed to be inclusive for making good disturbed portion if any & nothing extra will be admissible on this account.) | 1,023 | SQM | 20 ₹20,460 | 1 ₹1,023 Lowest | 30 ₹30,690 | 15 ₹15,345 |
| 4.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for but including sunken portion and roof concrete, unreinforced etc complete all as specified and as directed. | 1 | CUM | 150 ₹150 Lowest | 300 ₹300 | 600 ₹600 | 200 ₹200 |
| 5.00 | Dismantling of boarding, any description fixed in any position with nails i.e. in false ceiling and wall lining etc and similar position complete all as specified and directed. | 55 | SQM | 5 ₹275 Lowest | 12 ₹660 | 50 ₹2,750 | 10 ₹550 |
| 6.00 | Dismantling Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings any description and in any position, complete all as specified and directed. | 1,227 | SQM | 5 ₹6,135 Lowest | 16 ₹19,632 | 30 ₹36,810 | 10 ₹12,270 |
| 7.00 | Dismantling timber scantlings 40 sqcm and over in section, in any position of framed work.complete all as specified and directed. | 1 | CUM | 100 ₹100 Lowest | 1,500 ₹1,500 | 120 ₹120 | 500 ₹500 |
| 8.00 | Dismantling fillets, rails, posts, rafters, purlins, etc. under 40 sqcm in section of unframed work.complete all as specified and directed. | 1,626 | RM | 5 ₹8,130 Lowest | 10 ₹16,260 | 5 ₹8,130 Lowest | 10 ₹16,260 |
| 9.00 | M&L for Clean sawn Second class hard-wood in timber un framed and fixed scantlings. complete all as specified and directed. | 1 | CUM | 2,500 ₹2,500 Lowest | 85,000 ₹85,000 | 46,000 ₹46,000 | 40,000 ₹40,000 |
| 10.00 | M&L for Preparing old surfaces of wood and wood based materials, of any description and girth, not otherwise described and treated with, all over with one coats of creosote oil.complete all as specified and directed. | 250 | SQM | 30 ₹7,500 | 12 ₹3,000 Lowest | 30 ₹7,500 | 45 ₹11,250 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
7 Feb 2026, 6:00 pmClosed
COMMANDER WORKS ENGINEER PUNE - 01
HEADQUARTERS COMMANDER WORKS ENGINEERS GEN CARIAPPA MARG, PUNE-411 001
86218 SPECIAL REPAIR TO BLDG NO P-2 CBK OF DEPT OF PHARMACOLOGY AT AFMC UNDER GE (CENTRAL) PUNE.
2026_MES_747886_1
86218 CWE PUNE
Open Tender
Civil Works
Item Rate
90 days
GE (CENTRAL) PUNE
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹1,000
GE (CENTRAL)
₹1.8 L
Yes
12 May 2026
9 Jan 2026
14 Feb 2026
9 Jan 2026
7 Feb 2026
31 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | B&R PORTION
Dismantling single layer Mangalore pattern or similar tiles in roofing complete all as specified and as directed.
(Note : Contractor's quoted rate shall deemed to be inclusive for making good disturbed portion if any & nothing extra will be admissible on this account.) | 1,137 | SQM | - | - |
| - | Dismantling single layer Mangalore pattern or similar tiles in roofing portions bedded in lime or cement mortar, complete all as specified and as directed.
(Note : Contractor's quoted rate shall deemed to be inclusive for making good disturbed portion if any & nothing extra will be admissible on this account.) | 74 | SQM | - | - |
| - | Dismantling battens for tiles, shingles etc of any size including tilting fillets, spaced exc. 15 cm, complete all as specified and as directed.
(Note : Contractor's quoted rate shall deemed to be inclusive for making good disturbed portion if any & nothing extra will be admissible on this account.) | 1,023 | SQM | - | - |
| - | Demolition of cement concrete of any description and in any position not otherwise specifically provided for but including sunken portion and roof concrete, unreinforced etc complete all as specified and as directed. | 1 | CUM | - | - |
| - | Dismantling of boarding, any description fixed in any position with nails i.e. in false ceiling and wall lining etc and similar position complete all as specified and directed. | 55 | SQM | - | - |
| - | Dismantling Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings any description and in any position, complete all as specified and directed. | 1,227 | SQM | - | - |
| - | Dismantling timber scantlings 40 sqcm and over in section, in any position of framed work.complete all as specified and directed. | 1 | CUM | - | - |
| - | Dismantling fillets, rails, posts, rafters, purlins, etc. under 40 sqcm in section of unframed work.complete all as specified and directed. | 1,626 | RM | - | - |
| - | M&L for Clean sawn Second class hard-wood in timber un framed and fixed scantlings. complete all as specified and directed. | 1 | CUM | - | - |
| - | M&L for Preparing old surfaces of wood and wood based materials, of any description and girth, not otherwise described and treated with, all over with one coats of creosote oil.complete all as specified and directed. | 250 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_837527.xls
BOQ • 0.46 MB
86218TenderDocs.pdf
Tender Documents • 1.56 MB
86218CorrigendumNo5BOQ.pdf
PDF • 4.13 MB
86218CorrigendumNo4Date.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .