| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84.8 LAdmitted-Finance | -13.99% | ₹84.8 L | L1 | Admitted-Finance |
| 2 | L2₹93.2 L+₹8.4 L (9.87%)Admitted-Finance W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | -5.50% | ₹93.2 L+₹8.4 L (9.87%) | L2 | Admitted-Finance |
| 3 | L3₹98.4 L+₹13.6 L (16.1%)Admitted-Finance | -0.15% | ₹98.4 L+₹13.6 L (16.1%) | L3 | Admitted-Finance |
| 4 | L4₹98.6 L+₹13.8 L (16.3%)Admitted-Finance | +0.00% | ₹98.6 L+₹13.8 L (16.3%) | L4 | Admitted-Finance |
| 5 | L4₹98.6 L+₹13.8 L (16.3%)Admitted-Finance AT PALADA PO NAHAPADA PS DASARATHPUR DIST JAJPUR PIN 755014 | JAJAPUR | ODISHA | 755014 | +0.00% | ₹98.6 L+₹13.8 L (16.3%) | L4 | Admitted-Finance |
Tender Value
₹98.6 L
EMD Value
₹98,600
Closing Date
30 Jul 2026, 5:00 pmClosed
PA, ITDA, Kaptipada, Udala
At/PO- Udala
Repair and Renovation of various infrastructure in EMRS, Dhanghera under Khunta Block
2026_STSCD_136758_3
ITDAKPD-03/2026-27
National Competitive Bid
Civil Works - Others
Percentage
180 days
Khunta
B Class
2 documents required · 2 mandatory
₹10,000
₹98,600
Yes
3 Sept 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old cement plaster & removing the debries away from the work site within 50M. Lead including all labour, T&P etc. Complete as per direction of the Eng.-in-charge | - | - | - | - |
| 2 | Ground Floor | 900.96 | Sqm | 58.95 | ₹53,111.59 |
| 3 | First Floor | 596.76 | Sqm | 58.95 | ₹35,179 |
| 4 | Dismentaling A.S. flooring & removal of debries away from the work site within 50M. Lead including all labour, T&P etc. Complete as per direction of the Eng.-in-charge | 2,782.34 | Sqm | 117.9 | ₹3,28,037.89 |
| 5 | Dismentaling grading plaster & removal of debries away from the work site within 50M. Lead including all labour, T&P etc. Complete as per direction of the Eng.-in-charge | - | - | - | - |
| 6 | First Floor | 1,216.56 | Sqm | 91.37 | ₹1,11,157.09 |
| 7 | Earth work in excavation of foundation trenches in hard soil including dressing and levelling the bed up to 3.00 meter depth and depositing the excavated earth away from the work site if required with cost of all labour, T&P required for the work etc. complete as per direction of the Eng.-in-charge | 16.72 | Cum | 282.89 | ₹4,729.92 |
| 8 | Filling F&P with sand including cost,conveyance, royality and taxes of all materials & labour, T&P required for the work etc. Complete as per direction of the Eng.-in-charge | 2.21 | Cum | 716.17 | ₹1,582.74 |
| 9 | Cement concrete (1:3:6) using 4cm size black hard granite metal mixing concrete hoisting laying compacting watering curing including cost conveyance royalty taxes of all materials and cost of all labour etc. Complete as per direction of the Eng.-in-charge | 16.5 | Cum | 6,897.94 | ₹1,13,816.01 |
| 10 | Providing plain cement concrete (1:2:4) using 12mm size black hard granite chips mixing concrete hoistding laying compacting watering curing including cost conveyance taxes of all materials and cost of all labour etc. Complete as per specification and direction of the Eng.-in-charge | 1.23 | Cum | 8,548.45 | ₹10,514.59 |
stage.html
html • 0.16 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.15 MB
03.pdf
Tender Documents • 0.45 MB
BOQ_602861.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .