Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹106 (0.04%)Admitted-Fee/PreQual/Technical/Finance 601 6TH FLOOR INFINITY BENCHMARK ROAD NO 25 GP BLOCK SECTOR V BIDHANNAGAR NORTH 24 PARGANAS WEST BENGAL 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹2.4 L+₹106 (0.04%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RSC Projects Private limited L2 | THIRU.BALAMAINTHAN AGENCIES L1 |
|---|---|---|---|---|---|
| 1.00REPLACEMENT OF DAMAGED PORTION OF STEEL TRUSS, STEEL PURLINS AND AC SHEET ON CONTRACT BASIS | |||||
| 1.01 | Labour charges for fabrication and erection of MS Purlins and truss portions for replacing the damaged portion of steel truss and purlins including cost of dismantling of damaged portions of streel truss and purlins from roof and conveying the old steel scrap materials to the scrap yard, labour charge for applying red oxide, priming one coat and two coats of Aluminium paint for all new steel truss purlins, and labour charges | 4.6 | MT | 34,600 ₹1,59,160 | 20,490 ₹94,254 Lowest |
| 1.02 | Labour charges for fixing of AC corrugated sheets 6mm thick on the roofing upto 25m height including cost of 'J' or 'L' bolts bitumen washer including cost of dismantling of existing damaged AC sheets from roof and conveying the old AC sheets to the scrap yard | 600 | M² | 129 ₹77,400 Lowest | 237 ₹1,42,200 |
Tender Value
₹2.8 L
EMD Value
₹3,000
Closing Date
7 Aug 2026, 11:00 amClosed
ADMINISTRATOR
M.R. KRISHNAMURTHY COOPERATIVE SUGAR MILLS LIMITED, SETHIATHOPE - 608 702
Replacement of damaged portion of steel truss, steel purlins and AC sheet
2026_TNCSF_689872_1
1038/2026/A2/VOL1/MRKCSM
Open Tender
Miscellaneous Works
Supply
10 days
SETHIATHOPE
Please refer tender document
1 document required · 1 mandatory
₹0
₹3,000
Yes
14 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1REPLACEMENT OF DAMAGED PORTION OF STEEL TRUSS, STEEL PURLINS AND AC SHEET ON CONTRACT BASIS | |||||
| 1.01 | Labour charges for fabrication and erection of MS Purlins and truss portions for replacing the damaged portion of steel truss and purlins including cost of dismantling of damaged portions of streel truss and purlins from roof and conveying the old steel scrap materials to the scrap yard, labour charge for applying red oxide, priming one coat and two coats of Aluminium paint for all new steel truss purlins, and labour charges | 4.6 | MT | - | - |
| 1.02 | Labour charges for fixing of AC corrugated sheets 6mm thick on the roofing upto 25m height including cost of 'J' or 'L' bolts bitumen washer including cost of dismantling of existing damaged AC sheets from roof and conveying the old AC sheets to the scrap yard | 600 | M² | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_829292.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .