Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
13 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer, Kalimpong Circle, G.T.A.
Office of the Superintending Engineer, Kalimpong Circle, Gorkha Ranga Manch Bhawan, 3rd Floor, Right Wing, Darjeeling - 734101
Package II of Kalimpong Engineering Division
2026_GTA_5080897_2
NIeT_07(1st Call) /SDRF/SE/KC/GTA/2026-2027 (Sl. No. 1 to 9)
Open Tender
CIVIL WORKS
Percentage
180 days
Kalimpong
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.7 L
16 Oct 2026
16 Oct 2026
16 Nov 2026
16 Oct 2026
13 Nov 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (2.a) Recovery and Reconstruction of road from Sadh-do- bato to Children Park via Forest Office.(Length 0.60Km) under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by bull-dozer D 80 A-12, 180 HP and disposal of the sameon the valley side. . | 685.5 | cum | 61.8 | ₹42,363.9 |
| 2 | Earth work in excavation of foundation of structures
as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge.
(iii) Without pumping out water but including
shoring as required | 397.5 | cum | 115 | ₹45,712.5 |
| 3 | Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site | 43.05 | cum | 2,044 | ₹87,994.2 |
| 4 | Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site | 95.63 | cum | 3,739 | ₹3,57,541.88 |
| 5 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.
[Rate provided is exclusive of the cost of stone
boulders and sausage crate] | 84.4 | cum | 2,477.6 | ₹2,09,109.44 |
| 6 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. | 301 | sqm | 214 | ₹64,414 |
| 7 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | 133.11 | cum | 3,304 | ₹4,39,795.44 |
| 8 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 552 | sqm | 299.05 | ₹1,65,075.6 |
| 9 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications. | 85 | Each | 117 | ₹9,945 |
| 10 | Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to at hickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. | 82.88 | cum | 2,188.96 | ₹1,81,423.19 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5189055.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .