Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-Finance | ₹1.7 L | 1 | Accepted-Finance Lowest Amount Quoted |
| 2 | 2₹1.7 LRejected-Finance | ₹1.7 L | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | V VEERAMANIKANDAN L2 | VELAUTHAM BALASUBRAMANIAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound Wall at Munnerpallam Panchayat Union Primary School in Munneprallam Panchayat Palayamkottai Panchayat Union | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B for Foundation | 10.91 | Cum | 265 ₹2,891.15 | 263.7 ₹2,876.97 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 1.44 | Cum | 5,435 ₹7,826.40 | 5,426.4 ₹7,814.02 |
| 4.00 | Centring charges for all concrete works including its cost and conveyance and all labour charges etc., complete. | 26.63 | Sqm | 1,100 ₹29,293 | 1,095 ₹29,159.85 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc., complete. | 3.82 | Cum | 6,095 ₹23,282.90 | 6,051 ₹23,114.82 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete. | 4.98 | Cum | 8,915 ₹44,396.70 | 8,907.85 ₹44,361.09 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete. | 294.43 | Kg | 95 ₹27,970.85 | 91.86 ₹27,046.34 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 66.22 | Sqm | 285 ₹18,872.70 | 281.8 ₹18,660.80 |
| 9.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 62.77 | Sqm | 265 ₹16,634.05 | 262.4 ₹16,470.85 |
Tender Value
₹2.1 L
EMD Value
₹2,100
Closing Date
10 Mar 2026, 3:00 pmClosed
Commissioner, Panchayat Union, Palayamkottai.
Commissioner, Panchayat Union, Palayamkottai.
Construction of Compound Wall at Munneerpallam Panchayat Union Primary School in Munneerpallam Panchayat of Palayamkottai Panchayat Union
2026_RDTN_671665_2
A3/422/2026
Open Tender
Composite Works
Commissioner, Panchayat Union, Palayamkottai.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,100
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
Construction of Compound Wall at Munnerpallam Panchayat Union Primary School in Munneprallam Panchayat Palayamkottai Panchayat Union
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B for Foundation
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Centring charges for all concrete works including its cost and conveyance and all labour charges etc., complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_807168.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid