| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹11.7 L (9.65%)Admitted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | ₹1.3 Cr+₹11.7 L (9.65%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹19.5 L (16.0%)Admitted-Finance | ₹1.4 Cr+₹19.5 L (16.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹20.0 L (16.4%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.4 Cr+₹20.0 L (16.4%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹29.7 L (24.5%)Admitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹1.5 Cr+₹29.7 L (24.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.H.CONSTRUCTIONS L1 | S S AND CO L2 | Dillibabu L3 | K DHINAKARAN L4 | K S CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 1,170 | cum | - | - | - | - | - |
| 2.00 | Supplying and filling river sand for foundation and basement including watering and consolidation in15 cm layers including cost of sand all labour lead lift etc. complete | 50 | cum | - | - | - | - | - |
| 3.00 | Plain cement concrete 1:3:6, using 40mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 50 | cum | - | - | - | - | - |
| 4.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, curing, all labour charges, lead, lift, etc. complete.for raft and other concretes ( excluding cost of steel reinforcement.) without form work | 88 | cum | - | - | - | - | - |
| 5.00 | RCC in CC 1:1 1/2:3, mix using 12 to 20 mm HBG machine crushed metal for equipment plinth, retaining wall , side wall, cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) with form work | 129 | cum | - | - | - | - | - |
| 6.00 | Plain cement concrete M 1:2:4 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. Without form work | 194 | cum | - | - | - | - | - |
| 7.00 | Plain cement concrete 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work | 106 | cum | - | - | - | - | - |
| 8.00 | Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete. | 1,456 | sqm | - | - | - | - | - |
| 9.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete. | 17.5 | M.T | - | - | - | - | - |
| 10.00 | Supplying and filling with well gravel including watering, filling consolidation, cost of materials, all labour lead lift etc. complete | 470 | cum | - | - | - | - | - |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
18 Mar 2020, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai - 32
Providing Structural plinths, supplying and erection of GI lattice equipment structures for Enhancement of existing 230/110KV auto transformer capacity from 2x100 MVA to 3x100 MVA at Veearapuram 230/110 KV SS
2020_EB_159997_1
TP1-102/2019-20
Open Tender
Civil Works
Works
120 days
Veerapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
8 Jun 2020
3 Mar 2020
19 Mar 2020
3 Mar 2020
18 Mar 2020
3 Mar 2020
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Supplying and filling river sand for foundation and basement including watering and consolidation in15 cm layers including cost of sand all labour lead lift etc. complete
Plain cement concrete 1:3:6, using 40mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, curing, all labour charges, lead, lift, etc. complete.for raft and other concretes ( excluding cost of steel reinforcement.) without form work
RCC in CC 1:1 1/2:3, mix using 12 to 20 mm HBG machine crushed metal for equipment plinth, retaining wall , side wall, cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) with form work
Plain cement concrete M 1:2:4 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. Without form work
Plain cement concrete 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work
Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Supplying and filling with well gravel including watering, filling consolidation, cost of materials, all labour lead lift etc. complete
Supplying and filling with quarry dust including watering, filling consolidation, cost of materials, all labour lead lift etc. complete
Supplying and filling with 12-20mm HBG metal including cost of materials, filling consolidation, cost of materials, all labour lead lift etc. complete
Fabrication of MS angles/ Channels / ISMB including cost of all materials, labour charges for cutting, welding,and placing in position , transport charges from work shop to site painting,with enamel paint over a coat of primer as directed by the engineer at site.
Colour washing two coats using shell lime over one coat white washing, with approved quantity White cement over a waterbase primer as priming coat, including cost of all materials, labour, lead, lift, T&P, etc. complete.
Labour charges for supplying and assembling of template for all Structures including cost of template, transport charges all labour lead, lift, etc, complete.
Fabrication and supplying of Foundation bolt threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 3 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including all material, labour, lead, lift etc., complete 20 mm dia .
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonary if necessary including cost of all materials, labour,lead & lift etc.., complete. 40mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonary if necessary including cost of all materials, labour,lead & lift etc.., complete. 32mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonary if necessary including cost of all materials, labour,lead & lift etc.., complete. 25mm dia
Supplying & fixing gunmetal gate value including cost of materials, labour, lead & lift etc., complete. 32mm dia
Supplying & fixing gunmetal gate value including cost of materials, labour, lead & lift etc., complete. 25mm dia
Labour charge for back filling with excavated earth and spreading the excess earth around rhe structure including cost of all materials, labour,lead & lift etc.
Dismantling the existing RCC concrete plinths by drilling holes and breaking with compressor drilling machine, including cost of all labour charges, T & Ps etc., complete.
Supplying, fabrication and transporting of various equipments lattice structure including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Supplying, fabrication and transporting of various size of ISI GI Bolt&Nut with washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc complete.
Supply and fixing of 90 lbs rails in transformer plinth including cost of material and fixing charges etc complete and as directed by the Engineer-in-charge at site.
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection, cost of lead lift labour etc complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
S S AND CO
Dillibabu
K DHINAKARAN
K S CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_191487.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .