| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance 4 13A PERIYAR NAGAR THANGAMAPURIPATTANAM METTUR DAM 636 402 SALEM DT TAMIL NADU | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
4 Mar 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I MP ACP Unit III AWS Blower 3B Renewal of existing damaged blower assembly complete structural base frame vibrating pad pedestal frame etc
2021_EB_199026_1
SE / M-I / MTPS-I / MP / OT. 454 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
30 days
Mettur Thermal Power Station-I / Mettur Dam
As per the tender Specification
4 documents required · 4 mandatory
₹0
₹4,800
Yes
12 Mar 2021
26 Feb 2021
5 Mar 2021
26 Feb 2021
4 Mar 2021
26 Feb 2021
Amount
Charges for dismantling the worn out / damaged AWS blower 3B casing cover, truncated inlet cone, shaft from the impeller, removing the pulley, bearing, bearing housing, existing damaged angles and channels by cutting and other related works.
Charges for dismantling the damaged base structural frame of Air Washer Blower 3B from the vibration pad and fabrication & Erection of base structural frame with the vibration pad (including cost new cushy foot type vibration pad).
Charges for fabricating the circumferential casing cover and side cover plates with HR sheet after surface cleaning, bending to the required size, welding the sheet with the existing MS angle (MS sheets and MS angle will be supplied by board).
Charges for cutting, drilling and fabricating Pedestal flat frame from 16 mm Plate for fixing bearing housing, shaft and impeller as per required size.
Charges for Transporting the new shaft, impeller, inlet cone, pulley, Plummer block from central stores (Lorry will be supplied by Board)
Charges for erection of the New Truncated inlet cone and welding the cone with the existing MS angle.
Charges for placing the impeller in casing cover by chain pulley then fixing the shaft into impeller by chain pulley tightening the hub bolts and assembling the lock nut, bearing and bearing housing and pulley.
Charges for providing manual door along with handle at the center of the rear side blower door with bolts and nuts arrangements( as per sample).
Charges for scratching and cleaning, then painting of epoxy zinc chromate premier one coat and epoxy smoke grey painting two coat for AWS Blowers 3B (Inclusive of paint & Thinner).(The above work is inline with cost data code)
Charges for balancing the blower and commissioning the unit. Devolution of scrap materials of the damaged blower unit to CS/ MTPS
Consumables and T&P’s
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .