Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹21.3 L+₹22,211.51 (1.05%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹22 L
EMD Value
₹22,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Thally Block Block -2 Works- Package No TN-04-KRI-122
2020_RDTN_171084_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹22,000
DRDA Krishnagiri
27 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
13 Jul 2020
Amount
1.Improvements if Minor Irrigation Tank of Pattalamman Eri H/O Ballapalli - Rs. 10.00 Lakhs
Clearing the Light jungle and removed away from the site including all cutting charegs and all labour charegs as per standard specification
Earthwork in all soils excepthard rock requring blasting and conveying witj initial lead of 0m to 100m by devloying earth moving machineries and tippers for formation of bund I layers of suitable thickness, depending upon type of compaction equipment deployed and ot exceeeding earth fill breaking of clods, formation of bund,Breaking clodsand section
Formation of fore shore bund/Public usage by dumping the excees earth excavated soil after bund strengthening in all soil exept hard rock requring blastering and conveyance with initial lead 0 to 100m by deploying earth moving machniers and tippers for formation of bund in layer of suitable thickness
Trenching Wrok
Inlet Chanelling
Outlet Chanelling
Boundary stone
Provision of Name Board
2.Improvements if Minor Irrigation Tank of Penneri Eri @ Kempathpalli H/O Ballapalli - Rs. 12.00 Lakhs
Clearing the Light jungle and removed away from the site including all cutting charegs and all labour charegs as per standard specification
Earthwork in all soils excepthard rock requring blasting and conveying witj initial lead of 0m to 100m by devloying earth moving machineries and tippers for formation of bund I layers of suitable thickness, depending upon type of compaction equipment deployed and ot exceeeding earth fill breaking of clods, formation of bund,Breaking clodsand section
Formation of fore shore bund/Public usage by dumping the excees earth excavated soil after bund strengthening in all soil exept hard rock requring blastering and conveyance with initial lead 0 to 100m by deploying earth moving machniers and tippers for formation of bund in layer of suitable thickness
Trenching Wrok
Boundary stone
Provision of Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.JAYAPRAKASH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .