| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹4.9 L+₹5,090 (1.05%)Rejected-Finance VILL P O BAHIRI DIST BIRBHUM PIN 731240 | BIRBHUM | BIRBHUM | WEST BENGAL | 731240 | ₹4.9 L+₹5,090 (1.05%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹4.9 L+₹5,433 (1.12%)Rejected-Finance VILL RAMPUR P O ARUARA DIST PURBA BARDHAMAN | ARUARA | PURBA BARDHAMAN | WEST BENGAL | ₹4.9 L+₹5,433 (1.12%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹4.9 L+₹10,377 (2.14%)Rejected-Finance 120 KALIBAZAR WEST LANE 713101 | BURDWAN | PURBA BARDHAMAN | WEST BENGAL | 713101 | ₹4.9 L+₹10,377 (2.14%) | L4 | Rejected-Finance 4TH LOWEST |
| 5 | L5₹5.0 L+₹15,271 (3.16%)Rejected-Finance VILL PO BAHIRI PS BOLPUR DIST BIRBHUM PIN 713240 | BAHIRI | BIRBHUM | WEST BENGAL | 713240 | ₹5.0 L+₹15,271 (3.16%) | L5 | Rejected-Finance 5TH LOWEST |
Tender Value
₹4.9 L
EMD Value
₹9,789
Closing Date
22 May 2026, 11:00 amClosed
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
M/R to Cart Bridge at Ch 112.00 of 6 CMC along with allied works under Burdwan Section of D. C. No-I Sub-Division within D. C. Division (2nd Call).
2026_IWD_1024197_15
WBIW/EE-I/DCD/e-NIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
Burdwan Section
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,789
Yes
17 Jun 2026
15 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
II) By Mechanical Means .
a) Cement Concrete | 3.5 | Cum. | 560.15 | ₹1,960.52 |
| 1.01 | b) Reinforced Cement Concrete | 2.56 | Cum. | 921.26 | ₹2,358.43 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
(b) Cement mortar | 11.17 | Cum. | 333.7 | ₹3,727.43 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 52.87 | %cum | 14,214 | ₹7,51,494.18 |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. | 16.58 | %cum | 9,241.22 | ₹1,53,219.43 |
| 5 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
Do by fine sand. | 8.45 | Cum. | 823.78 | ₹6,960.94 |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety | 28.37 | Cum. | 5,556.63 | ₹1,57,641.59 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety | 16.48 | Cum. | 6,164.33 | ₹1,01,588.16 |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars,removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
Tor Steel rods / HYSD bars / TMT bars /Fe 415/Fe 500/Fe 500 D
( SAIL/TATA / RINL ) | 0.57 | MT | 68,928.81 | ₹39,289.42 |
| 9 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel
sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction
(b) Where staging is not required. | 122.98 | Sqm. | 255.05 | ₹31,366.05 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
2911i.pdf
Tender Documents • 1.26 MB
BOQ_2517220.xls
BOQ • 0.24 MB
1.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .