| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹17.7 L | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹18.4 LRejected-AOC 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹18.4 L | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | M S ENGINEERS L1 | ABBI ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils with initial lead and lift excepting all kinds of rock dumping the excavated materials away from work site manually within 50m initial lead and initial lift etc. complete as per direction of departmental officers. | 320 | m3 | 60 ₹19,200 | 105 ₹33,600 |
| 2.00 | Removal of Excavated Excess Earth away from the site to 3 K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 256 | m3 | 60 ₹15,360 | 80 ₹20,480 |
| 3.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 | 112 | m3 | 1,900 ₹2,12,800 | 1,950 ₹2,18,400 |
| 4.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 164 | m3 | 2,550 ₹4,18,200 | 2,585 ₹4,23,940 |
| 5.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 690 | m2 | 80 ₹55,200 | 90 ₹62,100 |
| 6.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 690 | m2 | 15 ₹10,350 | 30 ₹20,700 |
| 7.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 495 | m2 | 25 ₹12,375 | 55 ₹27,225 |
| 8.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 35 | m3 | 10,800 ₹3,78,000 | 10,840 ₹3,79,400 |
| 9.00 | Providing and laying Bituminous concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50- 2.36mm and 0.26 cum of 2.36 and below with 46.28 kgs of VG60/ VG70 bitumen,4.00 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm /30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80- 10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 48 | m3 | 11,100 ₹5,32,800 | 11,120 ₹5,33,760 |
| 10.00 | Road marking with hot applied Thermoplastic compound with reflectorising glass benads on bituminous suface.Providing and laying of hot applied thermoplastic compound
2.5mm exclusive of surface applied glass
beads as per IRC 35.The finished surface
to be level,uniform and free form streaks | 128 | m2 | 890 ₹1,13,920 | 905 ₹1,15,840 |
Tender Value
₹21.7 L
EMD Value
₹21,700
Closing Date
16 Dec 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Formation of BT Surface at Kurichi Lake Bund Road From Corporation School to Thiruvalluvar Statue in ward No 94 South Zone Coimbatore Corporation
2025_MAWS_629272_21
e58/2025
Open Tender
Civil Works
120 days
Coimbatore corporation
As per Tender Document
5 documents required · 5 mandatory
₹0
₹21,700
23 Mar 2026
8 Dec 2025
17 Dec 2025
8 Dec 2025
16 Dec 2025
8 Dec 2025
Amount
Earth work excavation in all soils with initial lead and lift excepting all kinds of rock dumping the excavated materials away from work site manually within 50m initial lead and initial lift etc. complete as per direction of departmental officers.
Removal of Excavated Excess Earth away from the site to 3 K.M including loading and transportation charges etc, complete as per standard specification. For 1M3
Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50- 2.36mm and 0.26 cum of 2.36 and below with 46.28 kgs of VG60/ VG70 bitumen,4.00 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm /30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80- 10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road marking with hot applied Thermoplastic compound with reflectorising glass benads on bituminous suface.Providing and laying of hot applied thermoplastic compound 2.5mm exclusive of surface applied glass beads as per IRC 35.The finished surface to be level,uniform and free form streaks
ABBI ASSOCIATES (BID ID -1535006)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Building.pdf
Tender Documents • 0.97 MB
BOQ_753144.xls
BOQ • 0.26 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid