Loading…
Loading…
Tender Value
₹22.4 L
EMD Value
₹44,700
Closing Date
7 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
Above/Below/Par
TECHNICAL
12 conditions · 1 needing a document upload
Tenderer must have to submit valid Electrical Contractor license as per Indian Electricity Rules for the respective category of works issued by Government Electrical License Board on or before the closing date of tender. Copy of the electrical contractor license should be submitted along with the tender offer, otherwise, the tender will be summarily rejected.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
52 conditions · 5 needing a document upload
Whether the cost of earnest money deposited
WHETHER VALID ELECTRICAL CONTRACTOR LICENCE AND SUPERVISOR LICENCE SUBMITTED
Migration to GST regime - Special Tender Conditions: The rates should clearly indicate the rate of applicable duties and taxes included in the prices quoted by them. Any variation in tax structure/ rate due to introduction of GST, shall be dealt with under Statutory Variation Clause. It should be ensure that bidders/tenderers are GST compliant and quoted tax structure/rates are as per GST Law.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor should submit the GSTIN number and same should be mentioned in the bills along with a copy of GSTIN registration certificate while submitting the bills to accounts for audit and payment, As GST is scheduled to implemented wef 01.07.2017. Without GSTN, no bill will be accepted w.e.f. 01.07.2017
From 01.07.2017 GST has been implemented but the detail guideline is still not clear. Hence, new tax structure on materials and labour will be applicable to both Railway & contractor after getting proper notification
Payment of Earnest Money deposit (EMD) , in respect of e- tendering,should be accepted through net banking or online payment gateway only
Construction of FOB at km 3/5-3/6 between BPB-PNGM for closure of trespassing under the jurisdiction of Sr.DEN/II/LMG(Electrical Portion)
EL-LM-26-27-02
EL-LM-26-27-02
Open
Works - General
90 Days
Hojai, Assam
₹0
₹44,700
7 May 2026
13 Apr 2026
23 Apr 2026
73 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 22,36,493.65 | ||
| — | 4.00 | — | — | ||
| Supply of 14.5 metre long Galvanized Iron (GI) Tubular Pole, conforming to IS 2713 (Part-I/II): 1980 and designation 410 SP-76, fabricated in three sections of 6.5 m, 4.0 m, and 4.0 m length, using high-quality mild steel tubes of sizes 219.1 mm x 5.9 mm (bottom), 193.7 mm x 4.85 mm (middle), and 165.1 mm x 4.5 mm (top), duly swaged and joined as per standard practice; the pole shall be hot-dip galvanized in accordance with IS 4759: 1996 and IS 2629: 1985 to ensure uniform coating and corrosion resistance, complete with suitable size base plate welded at the bottom for proper foundation fixing and a weatherproof cap at the top, including all necessary welding, finishing, and workmanship, and supplied complete in all respects as per relevant IS specifications and approved engineering standards, as per the direction of Engineer-in-Charge at site. | — | — | — | 2,16,335.04 | |
| — | 4.00 | — | — | ||
| Erection of steel tubular/rail pole including strut by embedding the pole to a depth of 1/5th of its total height in cement concrete foundation, comprising of base block of size 30 cm x 30 cm x 15 cm, with PCC in the ratio 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate of 40 mm nominal size), including excavation of earth, proper positioning, alignment, and verticality of the pole, and refilling of excavated earth up to 30 cm above ground level, complete with cement, sand, and stone chips (19 mm and below where required), and securing the pole firmly with holding clamps, bolts, nuts, and all necessary fittings, including curing and finishing, all complete as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 5,498.72 | |
| — | 15.00 | — | — | ||
| Fabrication, design, supply, carrying and erection of 12 mtr height swaged type (410- SP-66) G.I. Tubular pole (including supply and fixing of base plate and pole cap) by earth digging to a depth of 1/6th of the pole height with CC foundation in ratio 1:2:4 by cement ,sand and stone of nominal size 20 mm & the size of the CC block will be 30 cm dia with height upto the pole depth below GL and 30 cm above GL for muffing. The pole shall be hot dip galvanized with an average coating thickness of 70 microns conforming to IS:2629/IS:2633/IS:4759. The pole swaging, welding and base plate welding to be done as per IS:2713. The material construction(pipe) shall confirm to IS:1161/IS:1239 and shall be able to withstand maximum wind speed conforming to IS:875. Anti- climbing device by barbed wire upto 2.5 mtr height with necessary GI clamp/nut/bolts, etc has to be provided.Danger Board of size 8"X6" fixed with suitable GI clamp has to be provided showing the voltage grade,skull etc. The whole work shall be executed as per direction of Engineer in charge at site | — | — | — | 3,88,400.85 | |
| — | 10.00 | — | — | ||
| Supply ,installation,testing and commissioning of 6 metre long single longitudinally welded, single dipped hot dip galvanized octagonal pole (Type: BOP-6030) having 70 mm top diameter, 130 mm bottom diameter, and 3 mm thickness, manufactured as per ISO 9001:2000 & ISO 14001 standards, complete with suitable base plate of size 220 mm x 220 mm x 12 mm and top cap, including supply and construction of cement concrete foundation, embedding with anchor type foundation bolts (4 Nos., 20 mm diameter x 600 mm length in one set) in CC foundation, complete with 6 Amps SP MCB, fixing of bakelite sheet terminals, and wiring using 2 x 1.5 sq.mm copper cable from MCB to street light fitting, including all necessary accessories, erection, alignment, testing, and commissioning, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 1,18,324.9 | |
| — | 10.00 | — | — | ||
| Supply, erection, and fixing of MS Hot Dip Galvanized Single Arm Bracket having 1000 mm long arm made of pipe of 48.3 mm outer diameter and 3.25 mm thickness, complete with suitable size mounting pipe for proper fitment on 6 metre octagonal pole, including provision for cable entry, and fixing with bolts, nuts, washers, and all necessary accessories, duly fabricated, welded, and hot dip galvanized as per relevant IS standards, and installed complete in all respects as per the direction of Engineer-in-Charge at site. | — | — | — | 10,360.3 | |
| — | 20.00 | — | — | ||
| Supply, installation, testing and commissioning of 45 Watt outdoor LED street light luminaire with heat-resistant glass and connecting lead, having minimum system efficacy 105 lm/W, IP66 protection and Class-I safety, pressure die-cast aluminium powder-coated housing, THD <10% and power factor >0.95, with inbuilt surge protection of minimum 5 kV, suitable for outdoor applications, including all necessary accessories, mounting, wiring, and connections, ensuring maximum illumination for improved visibility during night including for persons with low vision, complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 76,716.6 | |
| — | 39.00 | — | — | ||
| Supply and erection of 2P composite polymer 33 kV pin insulator (10 kN) having minimum creepage distance of 340 mm and sectional length of 235 mm, manufactured from one- piece injection moulded silicone rubber housing directly bonded to high-quality, corrosion-resistant fibre glass (FRP) rod, with hot dip galvanized carbon steel end fittings properly sealed with silicon rubber, complete with all necessary hardware fittings, accessories, and clamps, conforming to IEC: 1109 or IS: 731 (1971) & IS: 2488 (Part-II) 1974, including proper installation, alignment, and fixing, and complete in all respects as per relevant standards and as directed by the Engineer-in-Charge at site. | — | — | — | 31,753.8 | |
| — | 24.00 | — | — | ||
| Supply and erection of 2P composite polymer 33 kV ball & socket type disc insulator (minimum 70 kN) having minimum creepage distance of 320 mm and sectional length of 300 mm, manufactured from one-piece injection moulded silicone rubber housing directly bonded to high- quality, corrosion-resistant fibre glass (FRP) rod, with hot dip galvanized carbon steel end fittings sealed with silicon rubber, complete with all necessary hardware fittings, accessories, and clamps, conforming to IEC: 1109 or IS: 731 (1971) & IS: 2488 (Part-II) 1974, including proper erection, alignment, and fixing, and complete in all respects as per relevant standards and as directed by the Engineer-in-Charge at site. | — | — | — | 45,312 | |
| — | 35.00 | — | — | ||
| Supply, fitting and fixing of GI channel arm of size 100 x 50 x 6 mm and 2200 mm length, complete with bracket clamped to pole using MS flat of size 50 x 5 mm and 50 x 16 mm bolts, nuts, and washers, suitable for mounting of insulators and lightning arrester, including drilling of necessary holes, proper alignment, tightening, and application of protective painting, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 27,074.95 | |
| — | 35.00 | — | — | ||
| Supply and fixing of GI angle of size 50 x 50 x 6 mm, forming 2200 mm long bracket for cross bracing, clamped to pole with GI flat of size 50 x 5 mm using 50 x 16 mm bolts, nuts, and washers, suitable for holding insulators and lightning arrester, including drilling of required holes, proper alignment, tightening, and application of protective painting, complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 17,269.35 | |
| — | 1500.00 | — | — | ||
| Supply, stringing and binding of ACSR Raccoon conductor of size 6/1/4.09 mm, conforming to IS: 398 (Part-II): 1976, including proper stringing, sagging, binding, and jumpering with suitable binding wire and accessories, ensuring correct tension and alignment, and no joints shall be permitted within a span, complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 78,750 | |
| — | 18.00 | — | — | ||
| Supply and erection of galvanized stay set for HT overhead line, complete with 19/20 mm diameter, 1.8 metre long stay rod, anchor plate of size 30 cm x 30 cm x 6 mm thickness, thimble, stay clamp, turn buckle (20 x 600 mm), 7/10 SWG stay wire, and strain insulator, including cement concrete foundation in the ratio 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate) with excavation, proper placement, tensioning, and refilling of earth, ensuring firm anchoring and alignment, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site . | — | — | — | 8,748.18 | |
| — | 600.00 | — | — | ||
| Supply and drawing of guard wire using 8 SWG GI wire, including cross lacing with 10 SWG GI wire at intervals not exceeding 1 metre, complete with proper stretching, binding, fixing, and alignment, along with all necessary accessories and fittings, ensuring effective protection of line crossings, and complete in all respects as per relevant IS standards and as directed by the Engineer- in-Charge at site. | — | — | — | 5,346 | |
| — | 18.00 | — | — | ||
| Supply, fitting, fixing and commissioning of porcelain guy (stay) insulator, complete with all necessary hardware fittings, clamps, binding materials, and accessories, including proper installation in stay wire, ensuring mechanical strength and electrical insulation, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 561.6 | |
| — | 6.00 | — | — | ||
| Supply, installation, testing and commissioning of pipe earthing complete with Bclass GI pipe earth electrode of 4000 mm length, 50 mm nominal bore and 3.6 mm wall thickness, provided with tapered / pointed lower end for easy driving into ground. The earth electrode shall be provided with welded GI strip of suitable size and necessary clamping arrangement. The earthing arrangement shall include provision of funnel with perforated GI plate at the top of the pipe for watering, homogeneous backfilling with selected earth / soil. In locations of high soil resistivity or rocky strata, approved earth resistivity enhancing compound such as bentonite or equivalent shall be used as directed by the Engineer-in-Charge. The connecting earth continuity conductor from earth electrode to distribution panel shall be GI wire not smaller than 8 SWG or equivalent GI strip capable of carrying the fault current. The earthing pit shall be provided with precast RCC earth chamber / earth box with CI / RCC cover complete with all accessories. The scope shall include excavation, driving of pipe electrode, welding / connection, watering arrangement, backfilling, dressing of surface, measurement of earth resistance using approved earth tester and painting of measured earth resistance value along with date of measurement on the earth pit cover / lid. The work shall be executed complete in all respects as per approved drawing No. PCEE/ELG/DRG/2024/1/Rev-1 dated 28.07.2025 and Technical Circular No. EL/PS/2025/1 (Pipe Earthing Arrangement) and to the satisfaction of the Engineer-in-Charge. | — | — | — | 9,658.8 | |
| — | 66.00 | — | — | ||
| Supply, fitting and fixing of GI pole clamp of size 50 x 6 mm suitable for rail/tubular pole, including all necessary bolts, nuts, washers and accessories, ensuring proper gripping, alignment, and tightening, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 6,370.32 | |
| — | 28.00 | — | — | ||
| Supply and fixing of danger board of size 10" x 8", made of dust, vermin, and corrosion-proof material, with proper inscription indicating voltage level and safety symbols, including suitable GI clamps/fasteners for secure mounting on pole/structure, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 2,947.84 | |
| — | 500.00 | — | — | ||
| Stringing and sagging of LT Aerial Bunched (AB) cable of various sizes, including 1 x 16 sq.mm phase conductor with 1 x 25 sq.mm messenger (neutral), 3 x 50 sq.mm phase conductor with 1 x 35 sq.mm messenger (neutral), and 1 x 16 sq.mm street lighting conductor, complete with proper stringing, sagging, tensioning, binding, and fixing with all necessary clamps, brackets, and accessories, ensuring correct clearance, alignment, and mechanical strength; the work shall also include loading, unloading, and transportation of cable to the actual work site by contractor's own arrangement, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site | — | — | — | 15,595 | |
| — | 400.00 | — | — | ||
| Supply, fitting and fixing of hot dip galvanized GI wire of 6 SWG, including proper stretching, binding, and fixing with all necessary accessories, ensuring adequate tension and alignment, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 16,800 | |
| — | 150.00 | — | — | ||
| Supply and erection of barbed wire up to a height of 2.5 metres on pole, including fixing with 2 Nos. of suitable size clamps along with all necessary bolts, nuts, and accessories, ensuring proper tensioning and secure installation, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 23,205 | |
| — | 500.00 | — | — | ||
| Supply, installation, testing, commissioning and fixing of GI nut, bolt and washer of size 75 x 16 mm, including all necessary accessories, proper tightening, alignment, and ensuring secure fastening, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 3,665 | |
| — | 600.00 | — | — | ||
| Laying, commissioning of LT/HT cable XLPEinsulated power cables with armoured aluminum conductors of different sizes partly along the pole andpartly through ground in cable trench.Loading, unloading & carrying of cable toactual work site by contractor own arrangement as per instruction of Engineer incharge at site. | — | — | — | 24,558 | |
| — | 12.00 | — | — | ||
| Supply, fixing, testing and commissioning of HT heat shrinkable type outdoor cable end termination kit suitable for single core 11 kV grade 120 sq.mm XLPE armoured cable, complete with all necessary accessories, lugs, glands, ferrules, sealing materials and insulating components, including proper termination, jointing and connection of 11 kV cable to overhead line through suitable PG clamp, ensuring safe and reliable operation, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 47,980.8 | |
| — | 200.00 | — | — | ||
| Supply, fitting, fixing and laying of HDPE pipe of 80 mm diameter conforming to IS: 4984:1995, having working pressure of 6 kgf/cm² and wall thickness of 7.6 mm, complete with all necessary accessories such as sockets, bends, couplers, tees, elbows, unions, and sockets, including threading to match with GI fittings, and clamping with suitable brackets for proper support, for use in protection of welding line cable, including all allied works, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 57,398 | |
| — | 200.00 | — | — | ||
| Making of cable trench of size 300 mm wide and 1000 mm deep by excavation of earth, including dressing, leveling, and disposal of surplus earth as required; laying of cable with proper protection by bricks on three sides and cushioning with sand, suitable for outside track crossing, followed by backfilling with earth/ballast and proper compaction, complete with all materials, labour, and allied works, and executed in accordance with enclosed specifications and as directed by the Engineer-in-Charge at site. | — | — | — | 10,150 | |
| — | 20.00 | — | — | ||
| Dismantling and uprooting of existing rail/tubular pole along with all accessories from the work site without causing any damage, including safe removal, handling, and transportation, and handing over the released materials to SSE-in-charge office, complete in all respects as per instructions of the Engineer-in-Charge at site | — | — | — | 19,096 | |
| — | 150.00 | — | — | ||
| Wiring for light/power plug point using 2 x 4 sq.mm FRLS PVC insulated copper conductor single core cable, along with 1 No. 4 sq.mm FRLS PVC insulated copper conductor single core cable for loop earthing, laid in surface/recessed medium class PVC conduit, including all necessary accessories such as conduits, bends, junction boxes, saddles, fasteners, and proper termination, ensuring neat workmanship and safety, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 50,100 | |
| — | 45.00 | — | — | ||
| Supply, fitting, fixing, connection and commissioning of 18/20 Watt LED indoor light fitting complete set, including LED tube and all necessary accessories, duly wired with 1.5 sq.mm flexible copper wire through PVC conduit/casing as required, including proper mounting, termination, testing, and ensuring safe and reliable operation, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 14,139 | |
| — | 10.00 | — | — | ||
| Supply and erection of 9.5 metre long GI tubular pole (Type: 410 SP@45'41@ with step lengths of 5.0 m, 2.25 m, and 2.25 m, having sectional diameters of 165.1 mm, 139.7 mm, and 114.3 mm with respective thicknesses of 5.4 mm, 4.50 mm, and 3.65 mm, conforming to IS: 2713:1980, complete with suitable size base plate and top cap, including digging of pit to a depth of 1/5th of the pole height, and supply and construction of cement concrete foundation in the ratio 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate of 19 mm nominal size) with CC block of size 30 cm x 30 cm from bottom of the pole up to 30 cm above ground level, including proper alignment, erection, curing, and backfilling, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 1,02,051.6 | |
| — | 2.00 | — | — | ||
| Supply, installation, testing and commissioning of 4-way Distribution Board (DB) box with metal door, having IP43 protection, suitable for indoor applications, complete with all necessary busbars, neutral link, earth bar, DIN rail, cable entry provisions, and fixing accessories, including proper mounting, wiring, termination, testing, and commissioning, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 4,240 | |
| — | 2.00 | — | — | ||
| Supply, installation, testing and commissioning of 32 Amp Double Pole (DP) MCB C curve, suitable for required voltage and breaking capacity, complete with proper mounting in DB, connections, testing, and commissioning, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 1,940 | |
| — | 4.00 | — | — | ||
| Supply, installation, testing and commissioning of 16 Amp SP MCB C curve, suitable for required voltage and breaking capacity, complete with proper mounting in DB, connections, testing, and commissioning, and complete in all respects as per relevant IS standards and as directed by the Engineer-in-Charge at site. | — | — | — | 1,176 | |
| — | 12.00 | — | — | ||
| Supply, fitting and installation of anchoring dead end clamp assembly suitable for bare/insulated messenger of MVCC cable, comprising of heavy-duty anchor/dead end clamp with high mechanical strength, corrosion-resistant aluminium alloy/thermoplastic body with serrated gripping arrangement, complete with galvanized steel bail/wire, 1 No. universal pole bracket, stainless steel (SS 304) strap with buckle, and all associated hardware accessories, designed to withstand specified mechanical load and environmental conditions; the assembly shall ensure firm anchorage, proper load transfer, and prevention of conductor slippage, and shall be suitable for outdoor installation; including mounting on pole/structure, proper tensioning, alignment, tightening, and testing, and complete in all respects as per relevant IS/IEC standards and as directed by the Engineer-in-Charge at site. | — | — | — | 2,19,120 | |
| — | 30.00 | — | — | ||
| Supply and fitting of suspension clamp assembly suitable for MVCC cable, comprising of 1 No. suspension clamp with bracket of high-strength, corrosion-resistant material, designed for adequate load bearing and proper conductor support, along with 1.5 metres stainless steel (SS 304) strap and 2 Nos. buckles, complete with all associated hardware and accessories; the assembly shall ensure uniform load distribution, prevention of cable damage, and secure suspension under varying mechanical and environmental conditions, including mounting on pole/structure, proper alignment, tightening, and testing, and complete in all respects as per relevant IS/IEC standards and as directed by the Engineer-in-Charge at site. | — | — | — | 3,94,350 | |
| — | 10.00 | — | — | ||
| Supply, installation, testing and commissioning of termination kit suitable for 1 core 120 sq.mm, 11 kV grade HT MVCC cable, complete with heat shrinkable insulating components, stress control tubes, anti-tracking sealing system, lugs, glands, ferrules, and all necessary accessories, suitable for outdoor application as required, ensuring proper termination, insulation, and sealing against moisture ingress, including cable preparation, crimping, connection, testing and commissioning, and complete in all respects as per relevant IS/IEC standards and as directed by the Engineer-in-Charge at site. | — | — | — | 47,500 | |
| — | 10.00 | — | — | ||
| Supply, installation, testing and commissioning of termination kit suitable for 1 core 120 sq.mm, 33 kV grade HT MVCC cable, complete with heat shrinkable type insulating components including stress control tubes, anti-tracking insulation, rain sheds (for outdoor use), sealing system, cable lugs, glands, ferrules, and all necessary accessories, designed to withstand specified electrical and environmental conditions, ensuring proper termination, insulation coordination, and moisture sealing, including cable preparation, crimping, connection, testing and commissioning, and complete in all respects as per relevant IS/IEC standards and as directed by the Engineer-in-Charge at site. | — | — | — | 1,34,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EL-LM-25-26-02final.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .