| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | ₹3.9 L | L1 | Accepted-AOC quoted less |
| 2 | L2₹3.9 L+₹2,702.82 (0.69%)Rejected-AOC | ₹3.9 L+₹2,702.82 (0.69%) | L2 | Rejected-AOC quoted more |
| Sl No | Description | Qty | Unit | Balaji Enterprices L2 | K.VENKATESALU L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling RCC by manual / by using deploying | 2 | Cum | 3,915.82 ₹7,831.64 Lowest | 3,915.82 ₹7,831.64 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 80 | Cum | 259.35 ₹20,748 Lowest | 259.35 ₹20,748 Lowest |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 10 | Cum | 1,820 ₹18,200 | 1,815.4 ₹18,154 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 10 | Cum | 5,166.71 ₹51,667.09 Lowest | 5,166.71 ₹51,667.09 Lowest |
| 5.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 180 | Sqm | 262 ₹47,160 | 250 ₹45,000 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 28.14 | Cum | 6,743 ₹1,89,748.02 | 6,740 ₹1,89,663.6 Lowest |
| 7.00 | Add GST 18% | 1 | No | 58,954.16 ₹58,954.16 | 58,541.76 ₹58,541.76 Lowest |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
31 Dec 2025, 3:00 pmClosed
The commissioner
Chengalpattu Municipality
construction of Swd at Muthurajan Coloney Ward no 25 in Chengalpattu municipalityy
2025_MAWS_635445_12
1388/2025/e1
Open Tender
Civil Works
Works
CHENGALPATTU MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,000
3 Aug 2026
24 Dec 2025
31 Dec 2025
24 Dec 2025
31 Dec 2025
24 Dec 2025
Dismantling RCC by manual / by using deploying
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Add GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_760931.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .