Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -0.12% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 L+₹239.85 (0.12%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.0 L+₹239.85 (0.12%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2 L
EMD Value
₹6,000
Closing Date
30 Jul 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const of Fencing Jamia Masjid Hafrada Payeen Ward no 3 phase 2nd
2026_RDPR_316802_20
NIT NO 67 OF 2026-27 ADF TARATHPORA
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹6,000
10 Aug 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
20 Jul 2026 - 20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6mix (1 Cement :3 coarse sand : 6graded stone aggregate 20mm nominal size) crushed stone aggregates including dewatering if any and head load | 5.35 | Cum | 5,733.6 | ₹30,674.76 |
| 2 | Providing and laying of stone soiling (hand packed )including dressing ramming ,watering and all leads lifts and carriage upto site of work complete (including dewatering if any) | 1.33 | Cum | 900 | ₹1,197 |
| 3 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4 | Cum | 7,571.55 | ₹30,286.2 |
| 4 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 4 | Cum | 1,455.65 | ₹5,822.6 |
| 5 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork | 1 | sqm | 0.01 | ₹0.01 |
| 6 | Foundations, footings, bases of columns etc. for mass concrete. | 39.02 | Sqm | 286.35 | ₹11,173.38 |
| 7 | 12 mm Cement plaster on the rough side of single or half brick wall of mix: 1:6 mix | 53.42 | sqm | 266.2 | ₹14,220.4 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture two or more coats on new work | 25 | sqm | 131.85 | ₹3,296.25 |
| 9 | Structural steel work weldded in built up sections,in framed work etc i/c cutting , hoisting , fixing in position and applying a priming coat of approved steel primer all complete. | 664 | kg | 138 | ₹91,632 |
| 10 | P/L of 40mm Cement concrete coping1:2:4 mix finished with floating coat of neat cement slurry and curing complete but excluding the cost of nozing of steps etc complete 40mm thick with 20mm nominial size stone aggregate including dewatering if any | 2.63 | sqm | 346.7 | ₹911.82 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1035098.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .