| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹20.6 L+₹20,611.97 (1.01%)Rejected-Finance | L2 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹20.6 L
EMD Value
₹2.1 L
Closing Date
16 Jun 2026, 1:00 pmClosed
Executive Officer
NPP MAU
ward 24 pathan tola me mini marrage hall ke partham tal ka nirmad karya
2026_DOLBU_1129983_2
68-109
Open Tender
Civil Works
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,080
Executive Officer
₹2.1 L
17 Jul 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lay out of building including making of reference pillars etc. complete. | 124.64 | cum | 12 | ₹1,495.68 |
| 2 | R.C.C. work with cement approved coarse sand 4 cm guage approved stone ballast in the proportion of 1:1 V2:3 in Column excluding supply reinforcement and its bending be same with 24 B.W.G.G.L. binding wire and including necessary centering and shuttering etc. and also including supply of all materials required for proper completion of the work. (binding wire to be supplied by the contractor free of cost). (S.I. 289) | 3.14 | cum | 7,170 | ₹22,492.29 |
| 3 | Same as above but in lintel in proportion of 1:2:4 (SL.No. 283) | 1.04 | cum | 8,500 | ₹8,823 |
| 4 | Same as above but in slab level beam in proportion of 1: 14:3. (S.L.No. 285(b)) | 0.25 | Cum | 9,580 | ₹2,423.74 |
| 5 | Same as above but in slab (S.I.No. 284(b)) | 15.58 | cum | 9,430 | ₹1,46,928.83 |
| 6 | M-150 brick in 1:4 cement & sand mortar in super structure for walls of 1 brick thick. (S.L.No. 305(b)+310) | 36.23 | cum | 5,220 | ₹1,89,131.04 |
| 7 | M-150 brick in 1:4 cement && sand mortar in super structure for walls of half brick wall (S.L.No. 305(b)+330(a)) | 2.97 | cum | 5,120 | ₹15,211.52 |
| 8 | Mild steel or iron in plain work such as RB or RCC work wrought to required shape as necessary including bending for proper completion of the work and including s/o all wastage and hooks steel and overlapping (SL.No. 504) | 27.52 | qtl | 5,650 | ₹1,55,504.95 |
| 9 | 12 mm thick wall plaster in 1:3 ratio with cement and approve coarse sand mortar including racking & washing joints etc. (S.LNo. 583) | 399.9 | sqm | 189 | ₹75,580.91 |
| 10 | Proting and laying Vitrified tiles of 600 x 600 mm in sizes hickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints. (Payment for grouting of joints to be made separately). | 116.6 | sqm | 1,605 | ₹1,87,144.61 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
BOQ_2166541.xls
BOQ • 0.27 MB
tech6801.pdf
Tender Documents • 6.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .