Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance JAUNPUR | UTTAR PRADESH | 212401 | ₹2.7 Cr | L1 | Accepted-Finance Admitted |
| 2 | L2₹2.7 CrRejected-Finance | ₹2.7 Cr | L2 | Rejected-Finance Not Admitted |
| 3 | L3₹3.3 CrRejected-Finance BHANSHAN CHOLA PUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹3.3 Cr | L3 | Rejected-Finance Not Admitted |
| 4 | Not Admitted-Finance 121 MOHALLA KHAIRUDDINGANJ NEW TEACHER COLONY POST MARIYAHU JAUNPUR | JAUNPUR | UTTAR PRADESH | - | - | Not Admitted-Finance Not qualified for AOC |
Updated dates
Tender Value
₹4.5 Cr
EMD Value
₹24.7 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
Renewal of Babatpur Jamalapur Road SH-98 in Distt. Jaunpur
2026_CEUVZ_1115581_1
214/SE Tender/jnp-gzp circle/25 Date-14-01-2026
Open Tender
Civil Works
150 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹24.7 L
Yes
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
15 Apr 2026
13 Feb 2026
16 Mar 2026
13 Feb 2026
16 Mar 2026
13 Feb 2026
13 Feb 2026
Providing and applying Tack Coat with Bitumen VG-10 using bitumen sprayer at the rate of 0.20 kg per sqm on the prepared surface cleaned by mechanical broom. (Including all material, T&P, labour cess etc. but excluding G.S.T.)With Table top
Providing and laying 30mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects. (Including all material, T&P, labour cess etc. but excluding G.S.T.)With Table top
Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2070208.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.13 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2070208.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid