| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.1 LAccepted-AOC M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | L1 | Accepted-AOC L1 | |
| 2 | L2₹69.0 L+₹9.9 L (16.7%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹71.7 L
EMD Value
₹1.4 L
Closing Date
3 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. I.W.C., Prayagraj
Office of S.E. I.W.C., 9 Saproo Road, Civil Lines Prayagraj
Construction of Trapezoidal CR Stone lining from Km. 0.225 to 0.625, 02 Nos. new VRB at Km. 4.600 and at Km. 9.970 and 06 Nos. outlet of Dhanawal Minor.
2022_UPIDC_751452_4
06/SE/2022-23
Open Tender
Civil Works
Item Wise
90 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
10 Jan 2023
28 Nov 2022
3 Dec 2022
28 Nov 2022
3 Dec 2022
28 Nov 2022
Amount
E/W in making approch/diversion for traffic including lead, lift and dressing, cost of all materials and labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge
Preparation of Sub-grade of canal profile for CR stone lining including proper dressing and manual compaction excluding cost of earth work etc. required for proper completion of work as per direction of Engineer-in-Charge. Excavated earth used for preparation of sub grade(if required)
Supplying and Laying 100mm thick local sand for canal profile below in cR stone lining including cost of all materials labour T&P etc. For proper completion of work. As per direction of Engineer in Charge.
Providing and Laying C.C. 1:3:6 in foundation including cost of all materials labours T&P etc. For proper completion of work. As per direction of Engineer in Charge.
Constrcution of C.R.Stone Masonary/ Lining with 1:3 C.M. sand mortar including cost of material labour T&P etc. as per direction of Engineer in Charge.
Construction 20mm Deep struck cement pointing on CR Stone Lining/masonary 1:2 in Canal Profile incuding cost of all material labours and T&P etc. For proper completion of work. As per direction of Engineer-in-charge.
Steel Reinforcement in R.C.C. Work inluding, cutting, bending, binding and placing in proper position including cost of steet binding wire labour and T&P etc. For proper completion of work. As per direction of Engineer in Charge.
Centrering & shuttering for C.C. & R.C.C. work including cost of all material, labour and T&P etc. For proper completion of work. As per direction of Engineer in Charge.
R.C.C. 1:1.5:3 in slab bridge including cost of all materials, labour T&P etc. But excluding cost of reinforcment. For proper completion of work. As per direction of Engineer in Charge.
E/W in Embankment for restoration of canal section on drainage crossing nearby in all type of soil mixed including cost of all materials, labour T&P etc. For proper completion of work. As per direction of Engineer in Charge.
Providing and fixing of 150mm dia HDPE rigid pressure pipe 6Kg/m2 requaired for proper completion of work. As per direction of Engineer-in-charge.
E/W in restoration of bank in all type soil mixed chhary and kanker with in 30m lead and 1.50m lift including refiling of excavated earth in trench dressing and manual compection requaired for proper completion of work. As per direction of Engineer-in-charge.
Providing an laying C.C. (1:2:4) in coping with coarde sand and cement and 10mm to 20mm crushed stone grite including cost of all materials, labour T&P etc.for proper completion of work. As per direction of Engineer-in-charge.
Supplying and laying of Stone pitching on VRB approach ramp including cost of all material labour and T&P etc. requaired for proper completion of work. As per direction of Engineer-in-charge.
Providing and appling colour washing of two coat on new surface parapet wall, abutment including cost of all materials, labour T&P etc.for proper completion of work. As per direction of Engineer-in-charge.
Fixing wheel guard stone including cost of all materials, labour T&P etc.for proper completion of work. As per direction of Engineer-in-charge.
MOHD. SHOEB KHAN
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .