Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance SHOP NO 30 SANJOG PALACE MARKET KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | -1.00% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | +2.00% | ₹1.7 L | L2 | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,360
Closing Date
13 Jun 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
K-2 A/mtc of EPHS in various Sector UE Karnal
2026_HBC_527438_1
2026966DA4FF B44E 4CBB AE1D 5B025C83C050240HSV
Open Tender
Civil Works
30 days
Karnal
2 documents required · 2 mandatory
₹250
₹3,360
Yes
19 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.PM026] PM026. Tractor with trolley | 5 | Per day | 6,237 | ₹31,185 |
| 2 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | 8 | Per day | 6,493 | ₹51,944 |
| 3 | [20.103.3]Development of tube well according to clause 9.3 of IS: 2800-1991 (Part-I) as amended up to date and specifications attached and as directed by the Engineer-in-charge of the work including the cost of all consumable stores, fuel, oil, compressors, pumps and machinery etc. as required for the work. 3. Compressor 1100cfm x 350 psi | 10 | Per Hour | 6,377 | ₹63,770 |
| 4 | [20.99.Zone-II]Water Supply installation of shallow/Medium/Deep tubewells as per IS 2800:1991 Supplying and packing graded gravel in bore well of size as per ISI 4097, as amended up to date (Grade A, 2.25mm to 3.35mm) and specification attached with this schedule of item of work. The gravel should be free from dust, dirt or vegetable matters. Packing to be done from reducer to the bottom of liner all around in the bore with Margin above reducer in the housing pipe as per the requirement and will be packed after liner and housing pipes have been lowered and suitably clamped. Thickness and size of the gravel packing will be designed and directed by the Engineer-in-charge strictly as per relevant ISI. Zone-II. Kurukshetra, Kaithal, Karnal | 10.19 | cum | 2,046 | ₹20,848.74 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_606424.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid