| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC | ₹13.8 L | 1 | Accepted-AOC Accept |
| 2 | 2₹14.0 LRejected-Finance | ₹14.0 L | 2 | Rejected-Finance Bidder Quoted value More than the estimate rate |
| Sl No | Description | Qty | Unit | SELVI L1 | R.VELUSAMY L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 98 | M³ | 161.02 ₹15,779.96 | 163.12 ₹15,985.76 |
| 2.00 | Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 10 | M³ | 5,286.07 ₹52,860.70 | 5,355.16 ₹53,551.60 |
| 3.00 | Supplying and erecting centering including necessary supports for the plane surfaces such as RCC Column Footing, Plinth Beam, & Sill Beam etc., using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding supported by casurina props of 10cm to 13cm dia spaced at suitable intervals etc., complete complying with standard specification. | 90 | M² | 956.71 ₹86,103.90 | 969.22 ₹87,229.80 |
| 4.00 | Supplying and erecting centering for soffits of Square / Rectangular Columns including strutting 3m high using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with M.S angles of size 25mm x 25mm x 3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced of 75cm c/c) etc., complete complying with standard specification. | 69 | M³ | 1,274.43 ₹87,935.67 | 1,291.09 ₹89,085.21 |
| 5.00 | Reinforced cement concrete 1:1½:3 [one cement, one and half M-Sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification. | 24 | M² | 8,967.91 ₹2.2 L | 9,085.14 ₹2.2 L |
| 6.00 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification. | 24 | M² | 9,104.6 ₹2.2 L | 9,223.61 ₹2.2 L |
| 7.00 | Brick work In CM 1:5 mix using best Second Class Table Moulded Chamber Burnt Bricks 9"x4½"x3" having 350 kg/cm² compressive strength and 15% or less water absorbent in the period of 24hours immersement and confirming to ISI specifications including finishing, curing etc., complete complying with standard specification. | 36 | M³ | 7,676.08 ₹2.8 L | 7,776.42 ₹2.8 L |
| 8.00 | Plastering with cement mortar 1:5 mix (one cement five P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 363 | M² | 278.06 ₹1.0 L | 281.7 ₹1.0 L |
| 9.00 | Painting two coats with approved Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface and curing etc., complete as per standard specification. | 363 | Qtl | 153.05 ₹55,557.15 | 155.05 ₹56,283.15 |
| 10.00 | Providing Fencing above compound wall using 2 ply and 4 pronged of 10 gauge Galvanised Barbed wire to 20cm equal spacing and 25 x 25 x 6mm 'L' angle to 1.00m height with an equal interval including cost and conveyance of all materials to site, fixing of 'L' angle in position with CC 1:2:4 bed block and fixing of barbed wire etc., complete complying with standard specification. | 156 | M³ | 374.83 ₹58,473.48 | 379.73 ₹59,237.88 |
Tender Value
₹14.2 L
EMD Value
₹28,400
Closing Date
20 Jan 2026, 3:00 pmClosed
Commissioner
Tiruppur City Municipal Corporation Office
Construction of Compound wall for Chandrakavi Middle School in Ward No 28
2026_MAWS_641515_2
343 / 2025-26 /Z4/ EE,Tcmc.,
Open Tender
Civil Works
90 days
TIRUPPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,400
14 Mar 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Supplying and erecting centering including necessary supports for the plane surfaces such as RCC Column Footing, Plinth Beam, & Sill Beam etc., using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding supported by casurina props of 10cm to 13cm dia spaced at suitable intervals etc., complete complying with standard specification.
Supplying and erecting centering for soffits of Square / Rectangular Columns including strutting 3m high using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with M.S angles of size 25mm x 25mm x 3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced of 75cm c/c) etc., complete complying with standard specification.
Reinforced cement concrete 1:1½:3 [one cement, one and half M-Sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification.
Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification.
Brick work In CM 1:5 mix using best Second Class Table Moulded Chamber Burnt Bricks 9"x4½"x3" having 350 kg/cm² compressive strength and 15% or less water absorbent in the period of 24hours immersement and confirming to ISI specifications including finishing, curing etc., complete complying with standard specification.
Plastering with cement mortar 1:5 mix (one cement five P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification.
Painting two coats with approved Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface and curing etc., complete as per standard specification.
Providing Fencing above compound wall using 2 ply and 4 pronged of 10 gauge Galvanised Barbed wire to 20cm equal spacing and 25 x 25 x 6mm 'L' angle to 1.00m height with an equal interval including cost and conveyance of all materials to site, fixing of 'L' angle in position with CC 1:2:4 bed block and fixing of barbed wire etc., complete complying with standard specification.
Add G.S.T. @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
002_Conditions.pdf
Tender Documents • 0.69 MB
BOQ_768392.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid