| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 LRejected-AOC | ₹2.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M Rajasekar L2 | KNP Contractor L1 |
|---|---|---|---|---|---|
| 1.00Reddipatty eri to Nathakadu (via) Ammankuttur, Pappan kadu KM 0/0-1/750 H/o Chittoor | |||||
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 23.25 | m3 | 2,852.42 ₹66,318.77 | 2,852.42 ₹66,318.77 |
| 3.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 232.5 | m2 | 75 ₹17,437.50 | 19.22 ₹4,468.65 |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 232.5 | m3 | 89 ₹20,692.50 | 82 ₹19,065 |
| 5.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 6.26 | m3 | 11,568.51 ₹72,418.87 | 11,568.51 ₹72,418.87 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 31,836 ₹31,836 | 29,209 ₹29,209 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
10 Nov 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Edappadi Panchayat Union
Salem District - Edappady Block - Reddipatty eri to Nathakadu (via) Ammankuttur , Pappan kadu KM 0/0-1/75 - Rural Road Maintenance Scheme 2025 26- Pothole repairs - Work No.06
2025_RDTN_619742_6
Roc.No.2688/2025/A2
Open Tender
Civil Works
90 days
BDO Office, Edappadi Panchayat Union
As per tender document
2 documents required · 2 mandatory
₹0
₹2,000
23 Feb 2026
4 Nov 2025
10 Nov 2025
4 Nov 2025
10 Nov 2025
4 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
06.pdf
Tender Documents • 1.00 MB
BOQ_740979.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid