| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance | ₹6.8 L | L1 | Accepted-Finance ok |
| 2 | L2₹7.1 LRejected-Finance | ₹7.1 L | L2 | Rejected-Finance reject |
| 3 | L3₹7.2 LRejected-Finance | ₹7.2 L | L3 | Rejected-Finance reject |
| 4 | L4₹7.4 LRejected-Finance | ₹7.4 L | L4 | Rejected-Finance reject |
| 5 | L5₹7.7 LRejected-Finance V P O DARINI TEHSIL SHAHPUR HIMACHAL PRADESH 176206 | DARINI | KANGRA | HIMACHAL PRADESH | 176206 | ₹7.7 L | L5 | Rejected-Finance reject |
Tender Value
₹7.9 L
EMD Value
₹15,810
Closing Date
10 Aug 2026, 4:00 pmClosed
EE HIMUDA DIVISION SHIMLA
HIMUDA DIVISION SHIMLA
Development of Education Infrastructure which are damaged due to heavy rainfall SH Construction of One No. Class Room at GPS Deothi Balsan Block Deha Distt. Shimla H.P.
2026_HIMUD_140486_1
NO HIMUDA SD E TENDER 3178-87 DATED 01.08.2026
Open Tender
Civil Works
Percentage
60 days
DEOTHI BALSAN
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
₹15,810
19 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting/Excavation in earth work by mechanical means (Hydraulic Excavator/manual means in all heights and depth in all kind of soil including saturated soil comprising of pick wok, jumper, Chiselling/wedging out of in soft and hard rock and their intermiate classification of soils including dewatering wherever required, setting out to required lines, levels as shown shown on the drawing as directed by the Engineer- in -charge at site, according to the HPPWD specification of 1990 vol-1 as sorting out usefull and unuseful material and stacking the same in all lead and lift and leveling of excavated earth on dumping sites (to be arranged by the contractor at his own risk and cost including payment of prescribed dumping charges of municipal committee/local body if any) through all modes of transportation including head load animal load and mechanical transportation to maximum possible extends in all leads means along with levelling fine dressing and all labour, machinery, materials, tools equipments and safty measure and incidentels necessary to complete the work by mechanized means and labour (if any required). All useful materials such as stone, shingles, aggregate and slates shall be sorted along road side and lift through all modes of transportation and used/removed as per direction of the Engineer-in-charge. Any loss to the private and public property during the course execution will be restored by the contractor whatsoever the nature of the same may be. The usable aggregate/ boulder /cutstone shall be taken in MAS Account anf further will be issued to the contractor as per issue rate mentioned under condition No. 46 of NIT Form 6. | 96.75 | Cum | 200 | ₹19,350 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil in all lead and lift as directed and entire satisfaction of the Engineer -in -charge in All kinds of soil. | 23.55 | Cum | 239 | ₹5,628.45 |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering including carriage of material in all leads and lifts. All work up to plinth level | |||||
| 3.01 | 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.62 | Cum | 6,376 | ₹16,705.12 |
| 3.02 | 1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.9 | Cum | 5,968 | ₹17,307.2 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing including carriage of material in all leads and lifts. in cement concrete 1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 13.5 | Cum | 8,154 | ₹1,10,079 |
| 5Centering and shuttering including strutting, propping etc. and removal of form work including carriage of material in all leads and lifts. | |||||
| 5.01 | Foundations, footings, bases for columns | 15 | Sqm | 246 | ₹3,690 |
| 5.02 | Centering and shuttering including strutting, propping etc. and removal of form work including carriage of material in all leads and lifts. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc | 19.5 | Sqm | 545 | ₹10,627.5 |
| 6 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth including carriage of material in all leads and lifts. | 9.68 | Sqm | 620 | ₹6,001.6 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 2.21 MB
Tendernotice_3.pdf
PDF • 0.18 MB
BOQ_208382.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].