Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹1,131.51 (0.78%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 L
EMD Value
₹8,700
Closing Date
13 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of Road Drain from House of Mohd Shafi Dar Mohd Iqbal Dar and others to Ab Ahad Dar and Gh Rasool Dar at Checki Hapatnar Koker Mohalla Panchayat Chrarisharief B Chrarisharief Budgam
2026_RDPR_317104_35
NIT_17_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
CHRAR I SHARIEF
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹8,700
29 Aug 2026
21 Jul 2026
14 Aug 2026
21 Jul 2026
13 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 125 | Sqm | 24.12 | ₹3,015 |
| 2 | Supplying and laying of Nallah muck/khak bajree/RBM like material including dressing, spreading , levelling and all carriages. | 4.68 | cum | 1,110 | ₹5,194.8 |
| 3 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | 46.8 | cum | 1,204.15 | ₹56,354.22 |
| 4 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 46.8 | cum | 768.15 | ₹35,949.42 |
| 5 | Supplying/Laying of red bajree/stone dust & 11.2mm screening including carriages | 7.02 | cum | 1,000 | ₹7,020 |
| 6 | Providing and laying 300mm dia non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete | 2 | No. | 3,200 | ₹6,400 |
| 7 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil.: 1m from cutting edge | 5.76 | cum | 479 | ₹2,759.04 |
| 8 | Providing and laying of dry stone solling hand packed including spreading , levelling and all carriages. | 1.44 | cum | 1,110 | ₹1,598.4 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 14.4 | Sqm | 286 | ₹4,118.4 |
| 10 | Providing and laying in position cement concrete with 20% plum of specified grade including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:3:6(1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size)
80% Concrete | 3.84 | cum | 5,673 | ₹21,784.32 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1037589.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .