| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹12.4 L+₹2,408 (0.19%)Rejected-Finance | L2 | Rejected-Finance ok |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
5 Dec 2024, 3:00 pmClosed
Executive Officer,Ayyampalayam Town Panchayat
Executive Officer,Ayyampalayam Town Panchayat
APM TP-15th Finance 24-25-Untied-Ist Install.Construction of Storm Water Drain at 10th ward, 11th ward and 12th ward in Ayyampalayam Town Panchayat
2024_DTP_506485_1
334/2024/A
Open Tender
Civil Works
Works
180 days
Ayyampalayam
APM TP-15th Finance 24-25-Untied-Ist Install.Construction of Storm Water Drain at 10th ward, 11th ward and 12th ward in Ayyampalayam Town Panchayat
2 documents required · 2 mandatory
₹0
₹15,000
23 Jan 2025
2 Dec 2024
5 Dec 2024
2 Dec 2024
5 Dec 2024
2 Dec 2024
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Plain cement concrete 1:4:8 mix ( One Part of cement , Four Part of Fine aggregates and Eight Part of Coarse aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,Finishing and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
Plain cement concrete 1:2:4 mix ( One Part of cement , Two Part of Fine aggregates and Four Part of Coarse aggregates) using 20 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,Finishing and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6),
Reinforced Cement Concrete 1:1½:3 Mix (one part of cement, One and half part of Fine aggregates and Three Part of Coarse aggregates) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing,But Excluding Cost of centering and Reinforcement etc., complete as per standard specifications.TNDSS NO:30 & VI (S2) VI (S5A) VII
Finishing the top of flooring with granolythic flooring with Plain cement concrete 1:2:4 ( One Part of cement , Two Part of Fine aggregates and Four Part of Coarse aggregates) using 10 to 12mm ISS HBG Stone Jelly of 25mm tk etc., Complete. including cost and conveyance of materials to work site & labour charges for mixing,laying,finishing and Curing etc,complete as per standard specifications.
S GNANAKARTHIKRAJAN (BID ID -1199427)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_602506.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .