Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC AT BIRADARPADA W NO 04 P O TALCHER TOWN DIST ANGUL | ANGUL | ODISHA | ₹19.1 L | L1 | Accepted-AOC Successful |
| 2 | L2₹19.3 LRejected-AOC AT BIRADARPADA W NO 04 P O TALCHER TOWN DIST ANGUL | ₹19.3 L | L2 | Rejected-AOC Unsuccessful |
Tender Value
₹19.1 L
EMD Value
₹19,060
Closing Date
8 Jun 2026, 5:00 pmClosed
Executive Officer, Talcher Municipality
At - Municipal Office, P.O. Talcher Town, Dist.Angul
Renovation of CC drain from Maharana Sahi towards Kumbhar Sahi in W.No.6
2026_ORULB_129955_3
TCRM-04/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Talcher Municipality Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹19,060
Yes
7 Aug 2026
29 May 2026
9 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. | - | cum | 858.58 | - |
| 2 | Dismantling B.M. in cement mortar under 3mtr height including stacking the useful materials for re-use & removing the debries away from work site within 50mtr lead. | - | cum | 1,611.74 | - |
| 3 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed etc., complete | - | cum | 299.53 | - |
| 4 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | - | cum | 725.95 | - |
| 5 | P.C.C (1:3:6) using 4cm size b.h.g (HB) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | - | cum | 5,989.99 | - |
| 6 | RCC M-20 cement concrete with using 12mm to 20 mm down graded chips with all cost labour material complete including cost of all machinary such as conccrete mixture,vibrator etc | 0.4 | cum | 6,039.72 | ₹2,409.85 |
| 7 | Labor for M.S. reinforcement for RCC work including cutting, bending, binding with all cost of labour, T&P, cost of binding wire, etc. complete. | 0.4 | qntl | 8,530.25 | ₹3,412.1 |
| 8 | Rigid smooth centering & shuttering for CC or R.C.C. work including false work & dismentalling then after casting with all cost etc. complete. | - | sqm | 248.67 | - |
| 9 | Carrage of earth including all cost etc. complete | - | cum | 276.01 | - |
| 10 | Spreading admix sand & moroom etc. complete including cost of all labours and hire charges of T & P materials required for work as per specification and directionof Enineer-in-charge. | - | cum | 858.58 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_592974.xls
BOQ • 0.30 MB
DTCN.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].