Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
21 Oct 2026, 3:30 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TEL WORKS
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnoverofV/N or 'V' whichever is less ; where V= Advertised value of the tenderincrores of Rupees N= Number of years prescribed for completion ofworkfor which bids have been invited. The average annualcontractualturnover shall be calculated as an average of "totalcontractualpayments" in the previous three financial years, as per theauditedbalance sheet. However, in case balance sheet of the previousyear isyet to be prepared/ audited, the audited balance sheet of thefourthprevious year shall be considered for calculating averageannualcontractual turnover. The tenderers shall submit requisiteinformation asper Annexure-VIB, along with copies of Audited BalanceSheets dulycertified by the Chartered Accountant/ Certificate fromCharteredAccountant duly supported by Audited Balance Sheet. As perClause No.10.2 of Tender Form (second Sheet) of Annex.I of Part- IofGCC2022,updated as per RB LetterNo.2022/CEI/CT/GCC2022/PolicyDated-14.07.22 with up to datecorrection slip.
a) The tenderer must have successfully completed orsubstantiallycompleted anyone of the following categories of work(s)during last 07(seven) years, ending last day of month previous to theone in whichtender is invited: (i) Three similar works each costing notless than theamount equal to 30% of advertised value of the tender, or(ii) Two similarworks each costing not less than the amount equal to 40%of advertisedvalue of the tender, or (iii) One similar work each costingnot less thanthe amount equal to 60% of advertised value of the tender.(b) (1) Incase of tenders for composite works (e.g. works involving morethan onedistinct component, such as Civil Engineering works, S&Tworks,Electrical works, OHE works etc. and in the case of majorbridgessubstructure, superstructure etc.), tenderer must havesuccessfullycompleted or substantially completed anyone of thefollowing categoriesof work(s) during last 07 (seven) years, ending lastday of monthprevious to the one in which tender is invited: (i) Threesimilar workseach costing not less than the amount equal to 30% ofadvertised valueof each component of tender, or (ii) Two similar workseach costing notless than the amount equal to 40% of advertised valueof eachcomponent of tender, or (iii) One similar work each costing notless thanthe amount equal to 60% of advertised value of eachcomponent oftender. Note for b(1): Separate completed works ofminimum requiredvalues shall also be considered for fulfillment oftechnical eligibilitycriteria for different components. (b) (2) In suchcases, what constitutesa component in a composite work shall be clearlypre-defined withestimated tender cost of it, as part of the tenderdocuments without anyambiguity. (b) (3) To evaluate the technicaleligibility of tenderer, onlycomponents of work as stipulated in tenderdocuments for evaluation oftechnical eligibility, shall be considered. Thescope of work covered inother remaining components shall be eitherexecuted by tendererhimself if he has work experience as mentioned inclause 7 of theStandard General Conditions of Contractor throughsubcontractorfulfilling the requirements as per clause 7 of the StandardGeneralConditions of Contract or jointly i.e., partly himself andremainingthrough subcontractor, with prior approval of Chief Signal &TelecomEngineer in writing. However, if required in tender documents byway ofSpecial Conditions, a formal agreement duly notarised,legallyenforceable in the court of law, shall be executed by the maincontractorwith the subcontractor for the component(s) of work proposedto beexecuted by the subcontractor(s), and shall be submitted along withtheoffer for considering subletting of that scope of work towardsfulfillmentof technical eligibility. Such subcontractor must fulfill technicaleligibilitycriteria as follows: The subcontractor shall have successfullycompletedat least one work similar to work proposed for subcontract,costing notless than 35% value of work to be sub-letted, in last 5 years,ending lastday of month previous to the one in which tender is invitedthrough aworks contract.
Note: for subletting of work costing up to Rs 50 lakh, no previousworkexperience of subcontractor shall be asked for by the Railway. Incaseafter award of contract or during execution of work it becomesnecessaryfor contractor to change subcontractor, the same shall be donewithsubcontractor(s) fulfilling the requirements as per clause 7 oftheStandard General Conditions of Contract, with prior approval ofChiefSignal & Telecom Engineer in writing. Note for Item 15.1:Workexperience certificate from private individual shall not beconsidered.However, in addition to work experience certificates issuedby any Govt.Organization, work experience certificate issued by Publiclistedcompany having average annual turnover of Rs 500 crore andabove inlast 3 financial years excluding the current financial year, listedonNational Stock Exchange or Bombay StockExchange,incorporated/registered at least 5 years prior to the date ofclosing oftender, shall also be considered provided the work experiencecertificatehas been issued by a person authorized by the Public listedcompany toissue such certificates. In case tenderer submits workexperiencecertificate issued by public listed company, the tenderer shallalso submitalong with work experience certificate, the relevant copy ofwork order,bill of quantities, bill wise details of payment received dulycertified byChartered Accountant, TDS certificates for all paymentsreceived andcopy of final/last bill paid by company in support of aboveworkexperience certificate.
Meaning of similar works: Any work involving Supply, Installation, testing& commissioning of IP based Video Surveillance system. OR Any workinvolving provision of IP-MPLS/VoIP Based System/Data CommEquipment/video conferencing system including installation &commissioning of switches/routers."(Auth. NWR/HQ LetterNo.SG.176/0/Vol-II Dt.28.04.2023)
5 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Certificate to be submitted by tenderer along with the tender documents as per Annexure-II and Annexure-II(A) attached in tender Document.
Declaration regarding constitution of firm & Bank Details as per Annexure-I attached in tender Document.
Mandatory undertaking Regarding Employment/ Partnership of Retired Railway Employees as per Annexure - XXIII attached in Tender Document, If applicable.
Relevant Annexure is to be submitted in connection with status of their firms. i. e. Either for Sole Proprietorship/Partnership/Company registered under companies Act 2013/LLP (Limited Liability Partnership)) Registered under LLP Act 2008/Registered Society and Registered Trust/HUF (Hindu undivided Family) Firm's. Prescribed Format (Relevant Annexure) as per Firm's status is attached in tender document as per clause 16.2
Ajmer Division-"Provision of CCTV for yard surveillance at A&B and D&E category stations of Ajmer division (Cluster station -Marwar Jn and Abu Road) for Cluster stations i.e. MJ for covering yards of DRS. BWA, AUWA, SOS, JAL stations and in cluster station ABR for covering yards of KVJ, PDWA, BNS. SRPJ, BMN, KWI, MXO, MAA, SIM, SZA,IQG, JTY, CTT & KRJD stations of Ajmer Division.
SNT-AII-42-2026-27~NWR
SNT-AII-42-2026-27
Open
Works - General
180 Days
Ajmer, Rajasthan
₹0
₹3.9 L
25 Sept 2026
25 Sept 2026
7 Oct 2026
124 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 64,17,262.91 | ||
| — | 1409.91 | — | — | ||
| Horizontal direction drilling/boring without damage of surface road /track using Auger Machine (HDD machine) or by Closed trench Method. The bore shall be upto 200 mm Dia & shall be done at the depth of minimum 1200 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. The length of the bore shall be minimum 4 Mtrs long. This includes insertion of different Dia DWC-HDPE pipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note: - Pipe Supply is not covered under this item. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 20,41,225.4 | |
| — | 14.21 | — | — | ||
| Supply of permanently Pre-lubricated HDPE duct, 40 mm OD, 33 ID as per RDSO specification No. RDSO/SPN/TC/45/2013 Rev. 2.0 Amdt. 3 or latest. The item also includes supply of all the accessories of HDPE duct like end caps, collars, bends, couplers etc. Inspection: (i) RDSO/RITES if value of item in work more than 10 lakhs(ii) Consignee if value of whole item in work less than 10 lakhs as per extant instructions by Railway Board.Inspection Charges: (i)Borne by Railways (ii) NonePayment Terms: 100% on Supply | — | — | — | 8,26,240.59 | |
| — | 14.13 | — | — | ||
| Laying of permanently Pre-lubricated HDPE duct, 40 mm OD, 33 ID as per RDSO specification No. RDSO/SPN/TC/45/2013 Rev. 2.0 Amdt. 3 or latest. The item also includes installation of all the accessories of HDPE duct like end caps, collars, bends, couplers etc. Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution. | — | — | — | 2,05,397.21 | |
| — | 14.13 | — | — | ||
| Blowing/drawing of OFC cables in the HDPE duct along with all the protective work as per instructions of engineer incharge at site.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution. | — | — | — | 1,83,740.02 | |
| — | 1407.51 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003 or latest alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on North Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m. (cum is Cubic Meter)Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 4,64,619.05 | |
| — | 1360.08 | — | — | ||
| Digging of trench 1.2 Mtrs. deep from rail flange/ road level and 0.3 Mtrs to 0.6 Mtrs wide and back filling after placing of DWC/ RCC/GI pipe. (Placing of DWC/RCC/GI pipe covered separately). The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. For track crossing, Drg. No. CSTE/3644 Pg.7 of 11 and for Road Crossing, Drg. No. CSTE/3644 Pg. 5 of 11 are to be followed. (cum is Cubic Meter)Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 4,48,962.41 | |
| — | 20799.99 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution | — | — | — | 2,27,759.89 | |
| — | 42.00 | — | — | ||
| Supply of various OFC joint enclosures Supply, preparation, splicing and installation of straight joint for 24 fibers along with enclosures with heat shrinkable splice protection sleeve as per TEC Specn. TEC 87080:2025 or latest. Splice losses in no case should be more than 0.1 dB.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution. | — | — | — | 5,74,252.98 | |
| — | 42.00 | — | — | ||
| Supply of various OFC termination boxes / FDMS Supply, installation, termination and testing of Rack/Wall mountable FDMS and termination as per TEC Specifications TEC 87020:2010 (TEC/GR/TX/FTB 01 /03/MAY-2010) or latest. IN and OUT 24 fiber OFC cables (with all connecting materials) routing/dressing fiber as per direction of engineer/In charge. This work includes termination/splicing of fibers and testing of fibers in the section/block and report of fiber to be submitted in hard and soft copy.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Execution. | — | — | — | 10,18,626 | |
| — | 62.00 | — | — | ||
| Supply of various OFC termination boxes / FDMS Supply, installation and complete wiring of optical fibre cable termination box for 6 fibres complete with base housing, base mountings with fixing arrangement etc. & splicing of fibre with low loss of pigtail cables. Splice losses in no case should be more than 0.1 dB. Necessary 0dB connectors should be provided in OFC termination box.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after execution. | — | — | — | 2,49,753.36 | |
| — | 23.00 | — | — | ||
| 19-inch rack items Supply of 12U Rack conforming to IEC 60297, with 19-inch standard dimension, wall mounting, front glass door with lock and two key, with rack fixing Multi point AC power strip, cable organiser with wall fixing screws.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after Supply. | — | — | — | 1,65,117 | |
| — | 23.00 | — | — | ||
| 19-inch rack items Installation, testing & commissioning of 2U/3U/4U/6U/9U/12U rack with 19-inch standard dimension as per instruction of Engineer in charge. It includes supply of all the accessories for fixing of the same.Inspection: ConsigneeInspection Charges: None.Payment Terms: 100% after execution. | — | — | — | 11,569 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ProvisionofCCTVforyardsurveillanceatStationsofAjmerdivisionClusterstation- Tender Document
ATTACHMENT
SNT-AII-42-2026-27-ProvisionofCCTVforyardsurveillanceatStationsofAjmerdivisionClusterstation-MarwarJnandAbuRoad.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .