Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,980
Closing Date
14 Jul 2026, 6:00 pm6d left
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_314753_20
2nd TIME e-NIT No. 19 REW UDHAMPUR of 2026-27 Dated 06-07-2026
Open Tender
Civil Works
90 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹4,980
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add Cost of Sign Board | 1 | No. | 2,800 | ₹2,800 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 22.5 | cum | 592 | ₹13,320 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected:All kinds of soil : | 5.2 | cum | 479.3 | ₹2,492.36 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.03 | cum | 4,826.5 | ₹4,971.3 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level.80 % concrete | 14.44 | cum | 5,733.6 | ₹82,793.18 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 14.71 | cum | 2,793.8 | ₹41,096.8 |
| 7 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 16.98 | Sqm | 266.2 | ₹4,520.08 |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 25.79 | Sqm | 286.35 | ₹7,384.97 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m.60% earth filling | 23.8 | cum | 218.4 | ₹5,197.92 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m.40% boulder filling | 15.9 | cum | 937.6 | ₹14,907.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1019430.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid