| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹23.0 LAccepted-Finance VILLAGE P O CHAURA TEHSIL NICHAR DISTRICT KINNAUR H P | ₹23.0 L | 1st | Accepted-Finance lowest |
| 2 | 2nd₹23.6 LRejected-Finance R O VILLAGE POST OFFICE DOHAG TEHSIL JOGINDER NAGAR DISTRICT MANDI H P | ₹23.6 L | 2nd | Rejected-Finance not lowest |
| 3 | 3rd₹24.0 LRejected-Finance VILLAGE PO PALKWAH TEHSIL HAROLI DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹24.0 L | 3rd | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | ABHISHEK KUMAR L2 | SUMIT KUMAR L3 | SURENDER SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition above G.L. upto floor two level including disposal of unserviceable materials within 20 metres lead and including cutting the necessary reinforcement and separating out from R.C.C. /R.B. works:- | 3.05 | cum | 11,500 ₹35,075 | 12,000 ₹36,600 | 11,000 ₹33,550 |
| 2.00 | Excavation in foundations in all kinds of soil such as pick work ,jumper work, blasting hard or soft rock chiseling where blasting is prohibited or saturated soil , lift upto 1.50 mtr stacking the excavated soil not more than 3.00 mtr clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with a lead of 20 mtrs. P/J Work . | 5.73 | cum | 600 ₹3,438 | 610 ₹3,495.30 | 550 ₹3,151.50 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20 mm nominal size) excluding cost of centring & Shuttering in. | 4 | cum | 11,500 ₹46,000 | 12,000 ₹48,000 | 11,000 ₹44,000 |
| 4.00Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: | ||||||
| 4.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string courses and the like with in all leads and lifts. | 5 | sqm | 62 ₹310 | 650 ₹3,250 | 600 ₹3,000 |
| 5.00Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and reinforcement for feinforced concrete work in: | ||||||
| 5.01 | Wall (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level : | 1 | cum | 14,500 ₹14,500 | 15,000 ₹15,000 | 14,000 ₹14,000 |
| 6.00 | Providing tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor two level to the entire satisfaction of the Engineer in charge.Tor steel with in all leads and lifts. | 72 | kg | 150 ₹10,800 | 160 ₹11,520 | 140 ₹10,080 |
| 7.00 | Providing & erecting MS rectangular water storage tank with ISMC wall stiffeners, complete. | 8.45 | mt | 1,17,700 ₹9.9 L | 1,18,000 ₹10.0 L | 1,15,698 ₹9.8 L |
| 8.00 | Supply and applying FRP ( Fibre Reinforced plastic) lining/coating to internal surface of MS tank including surface preparation by grinding, cleaning, degreasing etc. application of FRP laminate using glass fibre mat (minimum 450 GSM), isophthalic polyester/ vinylester resin with reqired catalyst and hardener, hardener, finishing with UV-resistant top coat, including all consumables such as brushes, rollers, PPE, labour charges, testing curing including GST and freight, complete ai all respects as per specifications and direction of Engineer-in- Charge. | 141 | sqm | 3,800 ₹5.4 L | 3,900 ₹5.5 L | 3,600 ₹5.1 L |
Tender Value
₹21.4 L
EMD Value
₹42,797
Closing Date
15 Apr 2026, 5:00 pmClosed
Executive Engineer
Division Reckong Peo
CO RCC Platform for MS Raw Sewerage collection tank, CO Raw sewerage collection tank with FRP Coating, Supply, Installation, testing and commissioning of 15 KVA Generator set sound proof along with allied accessories
2026_HPIPH_133715_1
KNR-JSD-Peo-EA-I-Tender
Open Tender
Civil Works
180 days
GP Nichar
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹42,797
29 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition above G.L. upto floor two level including disposal of unserviceable materials within 20 metres lead and including cutting the necessary reinforcement and separating out from R.C.C. /R.B. works:- | 1 | cum | - | - |
| 2Excavation in foundations in all kinds of soil such as pick work ,jumper work, blasting hard or soft rock chiseling where blasting is prohibited or saturated soil , lift upto 1.50 mtr stacking the excavated soil not more than 3.00 mtr clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with a lead of 20 mtrs. P/J Work . | |||||
| 3Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20 mm nominal size) excluding cost of centring & Shuttering in. | |||||
| 4Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: | |||||
| 4.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string courses and the like with in all leads and lifts. | - | sqm | - | - |
| 5Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and reinforcement for feinforced concrete work in: | |||||
| 5.01 | Wall (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level : | - | cum | - | - |
| 6Providing tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor two level to the entire satisfaction of the Engineer in charge.Tor steel with in all leads and lifts. | |||||
| 7 | Providing & erecting MS rectangular water storage tank with ISMC wall stiffeners, complete. | 1 | mt | - | - |
| 8Supply and applying FRP ( Fibre Reinforced plastic) lining/coating to internal surface of MS tank including surface preparation by grinding, cleaning, degreasing etc. application of FRP laminate using glass fibre mat (minimum 450 GSM), isophthalic polyester/ vinylester resin with reqired catalyst and hardener, hardener, finishing with UV-resistant top coat, including all consumables such as brushes, rollers, PPE, labour charges, testing curing including GST and freight, complete ai all respects as per specifications and direction of Engineer-in- Charge. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_2.pdf
PDF • 0.19 MB
Tendernotice_3.pdf
PDF • 0.06 MB
Tendernotice_4.pdf
PDF • 0.19 MB
BOQ_197755.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid