Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC Rejected | |
| 2 | L2₹11.5 L+₹2.1 L (22.7%)Rejected-Finance | L2 | Rejected-Finance REJECT | |
| 3 | L3₹14.2 L+₹4.8 L (51.6%)Rejected-Finance | L3 | Rejected-Finance REJECT |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
10 Jan 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. MGCCD-7 Bijnor
BIJNOR
CONSTRUCTION OF FALL AT KM. 7.000 OF PANWASA DY.
2022_UPIDC_669654_3
06/EE/2021-22
Open Tender
Civil Works - Canal
Item Rate
sambhal
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹30,000
Yes
12 Sept 2022
3 Jan 2022
10 Jan 2022
3 Jan 2022
10 Jan 2022
3 Jan 2022
3 Jan 2022 - 10 Jan 2022
90 days
Amount
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. per Sqm.
for CC work
For RCC work
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work. R/M
200 mm thick Dry brick pitching laid dry filling joints including all cost of material, labour and T&P etc. all complete. Per sqm.
Providing and laying coarse sand including all cost of material & labour & T&P etc…
Providing and laying 5-40 graded gravel under C.C. Block including all cost of material & labour & T&P etc…
Cement concrete in 1:1:2 (M-25) including all cost of material, labour , T&P etc. for completion of work per cum.
Laying R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
M/S MUBARIK CONTRACTOR
YADVENDER SINGH CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .