Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,883Accepted-AOC 134 1 SAKTHI THEATER STREET NEHRU NAGAR KARUMALAIKOODAL METTUR DAM 02 | METTUR DAM | TAMIL NADU | ₹96,883 Quoted ₹91,996 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Natesan Engineering Contractor L1 |
|---|---|---|---|---|
| 1.00 | Charges for complete cleaning of the oil sedimentation on the H.V.R. Transformer outer body, complete cleaning of the knife switch chamber, marshaling boxes of ESP rooftop at Unit I & II | 48 | Nos | 815 ₹39,120 |
| 2.00 | Charges for complete cleaning of the support insulator and its chambers in ESP rooftop at Unit I & II. | 192 | Nos | 200 ₹38,400 |
| 3.00 | Charges for complete cleaning of the collecting and Emitting electrode rapping motors in ESP Unit I & II. | 72 | Nos | 68 ₹4,896 |
| 4.00 | Charges for releasing of defective insulators from the chamber and re-fixing the new insulator ESP roof top Unit I & II (if necessary) | 4 | Nos | 1,720 ₹6,880 |
| 5.00 | Material cost for CRC | 2 | Nos | 420 ₹840 |
| 6.00 | Cost of Consumables required for HVRT cleaning at ESP | 1 | Nos | 1,860 ₹1,860 |
Tender Value
Refer Docs
Closing Date
22 May 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES EM-II SD-III- Cleaning of HVR Transformers, support insulators and rapping motors at ESP roof top of Unit-I, II during the respective Unit Annual overhaul for the year 2025-2026
2025_EB_555567_1
CE-MTPSI-SE-ES-EMII-OT26-25-26
Open Tender
Electrical Works
14 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
Yes
12 Mar 2026
8 May 2025
23 May 2025
8 May 2025
22 May 2025
8 May 2025
8 May 2025 - 22 May 2025
Amount
Charges for complete cleaning of the oil sedimentation on the H.V.R. Transformer outer body, complete cleaning of the knife switch chamber, marshaling boxes of ESP rooftop at Unit I & II
Charges for complete cleaning of the support insulator and its chambers in ESP rooftop at Unit I & II.
Charges for complete cleaning of the collecting and Emitting electrode rapping motors in ESP Unit I & II.
Charges for releasing of defective insulators from the chamber and re-fixing the new insulator ESP roof top Unit I & II (if necessary)
Material cost for CRC
Cost of Consumables required for HVRT cleaning at ESP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid