Expenditure
Capital (Works)
SNTCNTBM
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria:(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or(iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.(b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or(iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.(b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates.In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
SIMILAR NATURE OF WORK MEANS:Provision of LAN or WAN or Data connectivity.a. Submission of Undertaking by the tenderer in their offer that the equipments shall be procured from RDSO/TEC approved sources and installation, testing and commissioning of the equipments shall also be got done from the same RDSO/TEC approved source including after sales support required during warranty period.b. After award of the contract and before supply of equipments, MOU with RDSO/TEC approved source shall be submitted for supply, installation, testing and commissioning of equipments including after sales support required during warranty period.c. In the MOU, original equipment manufacturer 1.1.1 shall:i) Offer technical support for supply, installation and commissioning of the equipment.ii) Offer Warranty for equipment as per the condition laid in the tender document and RDSO/TEC specification for a period of one year from the date of commissioning.iii) Guarantee to supply spares for a minimum period of 7 years after the expiry of the warranty period.iv) Support Railways for entering into AMC/ARC if any on later date after the expiry of warranty period.v) The appropriate level of satisfactory performance certificate shall be obtained from Indian Railways /Govt./PSUs/ Quasi Govt. is from JA Grade officer in Indian Railways or equivalent.
13 conditions
Requisite EMD and cost of tender document to be paid through payment gateway.
Documentary proof of turnover
A copy of partnership deed and affidavit for proprietorship if applicable
Statement of Deviation, if any.
Experience certificate for Similar works executed
Complete technical data and particulars of the equipment offered
Form III to be filled and submitted by tenderers if covered under clause 17 and 18 under "conditions of tender".
Tenderer should advise the number of Engineer, Supervisors and Cable Jointers/Artisans employed by him or going to be employed with their names, qualifications, bio-data and experience in this particular trade under consideration along with the Tender
Irrevocable letters of commitment of the said supervisors and key technicians/artisans for doing the works shall be furnished along with tender papers, if they are not already in employment of the tenderer
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Supply, installation, configuration, testing and commissioning of Telecommunication and Networking arrangements for New Railway hospital at Madurai.
TBM-SG-CN-2026-27-05-OT~SR
TBM-SG-CN-2026-27-05-OT
Open
Works - General
4 Months
Chengalpattu, Tamil Nadu
₹0
₹3.8 L
30 Sept 2026
30 Sept 2026
7 Oct 2026
27 items across 1 schedule · ₹34,84,228.45 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply and Provision of Earthing as per RDSO Specification RDSO/SPN/197/2008 or latest (as per Technical Specification enclosed) | Numbers | 2.00 | 28,118.51 | 56,237.02 |
| 2 | "Supply of OFC Patch cord (FC-PC/SC-PC/LC- P C t o FC-PC/SC-PC/LC-PC s o a s t o s u i t for switches and FMS supplied)" | Metre | 50.00 | 374.03 | 18,701.5 |
| 3 | supply of switch board cable, finolex/Deltron make or better 0.5mm, 50 pair conforming to IRS/TC/24-91 | Metre | 500.00 | 230.13 | 1,15,065 |
| 4 | Supply of UTP Cable /CAT6/6A cable ETL or UL or CE3P certified panduit or Systimax or R&M or AMP or Molex or Krone Or D-LinkMakes | Metre 25000.00 | — | 34.73 | 8,68,250 |
| 5 | S u p p l y a n d installation o f 2 4 Fi b r e Joint enclosure f o r armoured optical fi b r e cable c o n f o r m i n g t o RDSO spec.RDSO/SPN/TC/68/2014 rev2.0 or latest | Numbers | 5.00 | 13,647.37 | 68,236.85 |
| 6 | Laying of STP/OFC/Power Cable/ switch board (10 pair/ 20 pair/50 pair) Cables in 1" PVC conduit/case c a p i n g a n d clamping on the wall/Roof tops/ Shelters with suitable clamping a n d hose t o b e provided where ever bends/ curves (PVC conduit/ Case capping and other accessories to be supplied by the contractor) | Metre 26000.00 | — | 37.3 | 9,69,800 |
| 7 | Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.3 Mtrs. (Laying of cables is not included in this schedule) | Metre | 1000.00 | 64.1 | 64,100 |
| 8 | Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 0.5 Mtrs and to a width of 0.3 Mtrs. (Laying of cables is not included in this schedule.) | Metre | 300.00 | 32.05 | 9,615 |
| 9 | "Refilling of cable trench 1m depth by 0.3m width throughout, with earth after laying of c a b l e s , a n d consolidating t h e t r e n c h by ramming and levelling." | Metre | 1000.00 | 15.4 | 15,400 |
| 10 | "Refilling of cable trench 0.5m depth by 0.3m width throughout, w ith earth after laying of cables, and consolidating the trench by ramming and leveling." | Metre | 300.00 | 7.77 | 2,331 |
| 11 | B l o w i n g / D r a w i n g o f O F C cable/Power cable/Signalling c a b l e i n s i d e permanently solid lubricated HDPE Pipe already laid. This work includes necessary duct integrity test for solid lubricated H D P E pipe. ( This includes Transportation o f materials from nominated stores to site) | Metre | 1000.00 | 23.43 | 23,430 |
| 12 | Supply of Handheld True RMS Multi Meter, as per Technical specification | Numbers | 1.00 | 23,192.34 | 23,192.34 |
| 13 | Supply of Handheld True RMS clamp Meter, as per Technical specification | Numbers | 1.00 | 33,510.29 | 33,510.29 |
| 14 | S u p p l y o f H a n d h e l d D i g i t a l Insulation Re s i s t a n c e Te s t e r , a s p e r Technical specification | Numbers | 1.00 | 51,165.02 | 51,165.02 |
| 15 | S u p p l y o f O T D R ( m i n i ) w i t h standard a c c e s s o r i e s f o r 1 3 1 0 / 1 5 5 0 n m w i t h all standard accessories as per TEC specification GR/OTD-02/02 Jan 2005 o r latest, ( this item should have valid TEC approval certificate) as per Technical specification | Numbers | 1.00 | 3,07,856.22 | 3,07,856.22 |
| 16 | Supply of Digital Earth clamp Tester as per Technical specification | Numbers | 1.00 | 71,129.79 | 71,129.79 |
| 17 | Supply of Laser source and Power meter with accessories as per Technical specification | Numbers | 1.00 | 40,710 | 40,710 |
| 18 | S u p p l y o f Fu s i o n S p l i c i n g M a c h i n e with accessories as per Technical specification | Numbers | 1.00 | 2,95,000 | 2,95,000 |
| 19 | S u p p l y o f Fi b e r V i s u a l Fa u l t Locato r with accessories, as per Technical specification | Numbers | 1.00 | 17,110 | 17,110 |
| 20 | S u p p l y o f Ro d o m e t e r a s p e r Technical specification | Numbers | 1.00 | 4,252.24 | 4,252.24 |
| 21 | Supply of HDPE Pipe 40mm (outer dia)/33 mm (inner dia) with couplers | Metre | 1000.00 | 60.93 | 60,930 |
| 22 | S u p p l y a n d I n s t a l l a t i o n o f Wall/Rack mountable 1 2 Fi b r e management system ( F M S ) conforming t o RDSO/SPN/TC- 37/2000(rev-3 a m d t - 1 o r l a t e s t sim ila r to COMMSCOPE m a k e o r bette r, suitable for splicing and front patching 12F cable with all accessories and terminating the optical fibre cable with splicing and front patching in FMS in the Location Box. This includes Supply and Provision of 4 nos of Patch cords of required l e n g t h ( A l l o t h e r m a t e r ia ls r e q u i r e d for splicing are to be supplied by contractor) | Numbers | 10.00 | 10,502 | 1,05,020 |
| 23 | S u p p l y a n d I n s t a l l a t i o n o f Wall/Rack mountable 2 4 Fi b r e management system ( F M S ) conforming t o RDSO/SPN/TC- 37/2000(rev-3 a m d t - 1 o r l a t e s t sim ila r to COMMSCOPE m a k e o r bette r, suitable for splicing and front patching 24F cable with all accessories and terminating the optical fibre cable with splicing and front patching in FMS in the Location Box. This includes Supply and Provision of 4 nos of Patch cords of required l e n g t h ( A l l o t h e r m a t e r ia ls r e q u i r e d for splicing are to be supplied by contractor ) | Numbers | 4.00 | 18,686.74 | 74,746.96 |
| 24 | S u p p l y a n d Installation o f s u r f a c e Wall mountable type 1 9 i n c h 1 2 U network Rack with front glass door with lock and rack fixing multipoint A C P o w e r t r i p & all accessories (Power extension board with one set of MCB, exhaust fan, cable manager) | Numbers | 10.00 | 6,761.51 | 67,615.1 |
| 25 | Supply and Installation of covered 19inch Racks of size 1950mm x600mm x 600mm or higher (Make: HCL/ Vero/President/ Rittal/ Puncom or better) complete with all fittings including DC Fans (24V/48V)-2nos, separator sheet/ plate to keep testing equipment-1no and AC power distribution panel ( Horizontal fitting) with power sockets and fuse protection ( min 6 nos of 230V - 15/5A combined and other accessories | Numbers | 1.00 | 65,734.12 | 65,734.12 |
| 26 | Provision of HDPE Pipe of dia 40/33 mm | Metre | 1500.00 | 26.11 | 39,165 |
| 27 | Transportation of Signalling materials by road a s p e r t h e i n s t r u c t i o n s o f Railway representative at site. The work also includes l o a d i n g a n d u n lo a d in g o f the materials a)Transportation o f Signalling materials upto 100kms | MT-Km | 700.00 | 22.75 | 15,925 |
| Schedule total | ₹34,84,228.45 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022.pdf
ATTACHMENT
GCC-ACS1.pdf
ATTACHMENT
GCC-ACS2.pdf
ATTACHMENT
GCC-ACS3.pdf
ATTACHMENT
GCC-ACS4.pdf
ATTACHMENT
GCC-ACS5.pdf
ATTACHMENT
GCC-ACS6.pdf
ATTACHMENT
GCC-ACS7.pdf
ATTACHMENT
GCC-ACS8.pdf
ATTACHMENT
GCC-ACS9.pdf
ATTACHMENT
GCC-ACS10.pdf
ATTACHMENT
GCC-ACS11.pdf
ATTACHMENT
MDURHGADApproved.pdf
ATTACHMENT
gcc-acs-12_compressed.pdf
ATTACHMENT
SOR2022.pdf
ATTACHMENT
TenderDocumentRHMDUVolI_1.pdf Tender document Vol I
ATTACHMENT
jpo_ann_to_cir_17-2013.pdf
ATTACHMENT
TenderDocumentRHMDUVolI_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .