| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.1 L+₹38,574.91 (10.4%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.4 L+₹72,832.98 (19.7%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹11,060
Closing Date
28 Sept 2026, 4:30 pmClosed
Executive Engineer University of Kashmir
Construction Division
Construction of new Washrooms (Male and Female) at Botanical Garden, Main Campus, University of Kashmir
2026_UDJK_324975_1
F(E.Tend)(Const. Washroom Botanical Garden)(UCD)/KU/19/26
Open Tender
Civil Works
Percentage
90 days
Main Campus
As per NIT
4 documents required · 4 mandatory
₹300
Registrar University of Kashmir
₹11,060
5 Oct 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual/Mechanical means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead as directed from edge of cutting .All kinds of soil. | 6.77 | CUM | 300 | ₹2,031 |
| 2 | Supplying and laying of stone soling hand packed tightly including ramming, watering and carriages complete. | 5.29 | CUM | 1,250 | ₹6,612.5 |
| 3 | Concrete work.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. All work up to all levels.1:4:8 (1Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) Crushed | 1.56 | CUM | 5,702 | ₹8,895.12 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing and all carriages but excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level.
1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size) | 3.26 | CUM | 8,031 | ₹26,181.06 |
| 5 | Steel Work Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete up to all floors. Thermomechanically heated bars | 326.4 | K.G | 123.2 | ₹40,212.48 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all levels.
1:2:4 (1Cement: 2 coarse sand:4 graded stone aggregate 20mm nominal Size) Crushed | 6.69 | CUM | 7,091 | ₹47,438.79 |
| 7Form work. Centering and shuttering including strutting propping etc. removal of form work in | |||||
| 7.01 | Foundation footings basis of columns etc. for mass concrete. | 38.3 | SQM | 286.4 | ₹10,969.12 |
| 7.02 | Lintels, beams, plinth beams, girders, bressumers, cantilevers, Columns, pillars, piers, abutments, posts and struts and edges of slabs etc. (M.S. Plates/Ply wood) | 20 | SQM | 718 | ₹14,360 |
| 8 | Brick work with FPS bricks of class designation 75 in super structure up to all floors.
In cement mortar 1cement: 6 fine sand mortar. | 7.99 | CUM | 9,500 | ₹75,905 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1096787.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .