Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 for P2₹4.2 LAccepted-AOC AKASH BHAVAN MOREDONGRI ROAD PATTHAKHEDA SARNI DISTT BETUL MADHYA PRADESH | SARNI | BETUL | MADHYA PRADESH | 460447 | L1 for P2 | Accepted-AOC L1 for Package 2 | |
| 2 | L1 for P3,₹4.2 LAccepted-AOC WARD NO 2 SAI COLONY SARNI DISTT BETUL MP | SARNI | BETUL | MADHYA PRADESH | 460447 | L1 for P3, | Accepted-AOC L1 for P3,P4 |
| Sl No | Description | Qty | Unit | S D PATANKAR L1 | TAPASYA ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00Overhaul work of 6.6 KV / 415V LT Switchgears of Unit 10, BTG & BOP AREA of PH-IV | |||||
| 1.01 | Cleaning, tightness, checking & overhauling work of various 415 V bus/MCC and all motor modules / DC Panels in MCCs during AOH/COH of U#10 | 35 | Nos | 75,250 ₹88,795 Lowest | 91,000 ₹1,07,380 |
| 1.02 | Cleaning, tightness, checking and overhaul work of various 6.6KV switchgear / panels during AOH/COH | 5 | Nos | 10,750 ₹12,685 Lowest | 13,000 ₹15,340 |
Tender Value
₹9.8 L
EMD Value
₹19,500
Closing Date
29 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE P and W
STPS Sarni
Overhauling work of various 6.6KV HT motors, 415V L.T. motors during AOH COH shutdown of Unit No.10 and 11, or as per available opportunity for motors and common auxiliaries of PH 4 STPS, Sarni .
2023_MPPGC_317758_1
WE-4489
Open Tender
Electrical Works
Item Rate
40 days
STPS Sarni
As per NIT
11 documents required · 11 mandatory
₹500
Yes
₹19,500
Yes
12 Aug 2025
21 Dec 2023
31 Jan 2024
21 Dec 2023
29 Jan 2024
21 Dec 2023
Overhaul work of 6.6 KV / 415V LT Switchgears of Unit 10, BTG & BOP AREA of PH-IV
Cleaning, tightness, checking & overhauling work of various 415 V bus/MCC and all motor modules / DC Panels in MCCs during AOH/COH of U#10
Cleaning, tightness, checking and overhaul work of various 6.6KV switchgear / panels during AOH/COH
Description of Work / Item(s)
Complete overhauling AOH/COH/Shut down work of 6.6KV HT motor of Unit No. 10/11 of STPS Sarni,
ID Fan Motor of Capacity 2250KW
PA Fan Motor of Capacity 1780 KW
BFP Motor of Capacity 4600 KW
CEP Motor of Capacity 325KW
Coal Mill Motor of Capacity 450KW
Raw water pump motor of capacity 270KW
Shifting & Re-shifting of ID fan motors (Weight Approx. 14000 Kg).
Shifting of ID fan Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of ID fan motors from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of CW pump motor ( Approx. weight 13000 Kg)
Shifting of CW pump Motor from CW pump house to unloading bay (U#10/U#11)
Re-shifting of CW pump motor from unloading bay (U#10/U#11) to CW pump house.
Shifting & Re-shifting of PA Fan motors (Weight Approx. 8850 kg ).
Shifting of PA fan Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of PA fan motors from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of FD Fan motor ( Approx. weight 4950 Kg)
Shifting of FD Fan Motor From foundation to unloading bay U#10 /U#11.
Re-shifting of FD Fan motor from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of Coal Mill motors (Weight Approx. 5750 Kg).
Shifting of Coal Mill Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of Coal Mill motors from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of BFP motors (Weight Approx. 14200kg ).
Shifting of BFP Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of BFP motors from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of CEP motors (Weight Approx. 3650 kg ).
Shifting of CEP Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of CEP motors from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of Inst./Plant Air Compressor motors (Weight Approx. 2300 Kg).
Shifting of Inst./Plant Air Compressor Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of Inst./Plant Air Compressor motors from unloading bay to its foundation (U#10/U#11).
Shifting & Re-shifting of Raw Water Pumps motors (Weight Approx. 3000 Kg).
Shifting of Raw Water Pumps Motors of (U#10 & U# 11) From foundation to unloading bay U#10 /U#11.
Re-shifting of Raw Water Pumps motors from unloading bay to its foundation (U#10/U#11).
Description of Work / Item(s)
BTG AREA
Clean out conveyor, Vacuum pump of generator, stirrer for dosing fan/ pump.
A/H Guide Bearing & Support Brg, Oil Vapour extractor, Hydrazine & Amonia dosing, Cooling Fan HPSU-1, circulation pump HPSU-2 .
ID LOP, Cooling Fan HPSU-2,CF circulation HPSU-1 etc.
Coal Feeder, AC Scanner, FD/PA/Mill/BFP motor LOP, COLTC ,Compr. AC SOP
APH main drive, ID Hydraulic coupling, Control Fluid HPSU main motor, hot well make up pump, Ai
Seal air fan motor, AOP, EOP
AC JOP, chilled water & condensate water of AC System
Vacuum Pump
DMCW SG, Boiler fill pump
DMCW TG
BOP area excluding ETP.
Sulphuric acid dosing pump, Antiscalant dosing pump, CMT- SBA Tank etc.
Acid dosing pump (UF), NaOCl dosing pump (UF), DM plant STP etc.
Degasser Blower, Lime dosing pump.
Flash Mixer, Clariflocculator Mechanism etc.
AC Condset motor , mixed air blowers etc.
CST, N-pit, Jockey pump etc.18.5KW
DM feed pump 30/37/45KW
CT Make Up Pumps, AC chilled & conde. Water motor etc.5KW
Service Water pump Motor 75KW
Hydrant pump, Spray pump160KW
ESP/APH backwash pump
ETP Area
PE dosing Agitator NaOH to PH
Lime, NaOCL dosing motor.
Dolomite dosing degasser
Acid unloading & HRSCC Agitator
Alkali unloading, ETP Motor at FOPH
Sludge Transformer ETP motor at GT#10 & #11
MGF Blower, ETP motor of Boiler U#10 & 11
MGF Back wash motor
UF Feed, cartridge feed, RO Cleaning motor, ETP vertical Motor
MGF Feed motor, RO HP motor
UF Backwash motor
Various overhaul work related to soot blower:
Complete OH work of soot blower (Rotary Motor and Travel Motor) Including, cleaning, disconnecting, shifting, re-shifting and installation.
Complete OH work of long retractable soot blower (Rotary Motor and Travel Motor) Including cleaning, disconnecting, shifting, re-shifting and installation.
Cleaning and replacement of soot blower JB & limit switch including cable termination
Repairing & painting of soot blower motor covers by paint of standard quality (green colour)
Description of Work / Item(s)
Amount
Minor OH works of HT Motors of Unit 10/, 11 in PH-IV at STPS, Sarni.
TAPASYA ENGINEERING
S D PATANKAR
TAPASYA ENGINEERING
S D PATANKAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .