| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹5.8 L+₹16,752.24 (2.97%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer |
| Sl No | Description | Qty | Unit | Thulasi L1 | RADISHKUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth | 72.93 | Cum | 263 ₹19,180.59 Lowest | 271 ₹19,764.03 |
| 2.00 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 15.9 | Cum | 5,345 ₹84,985.5 Lowest | 5,505 ₹87,529.5 |
| 3.00 | CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks | 244.08 | Sqm | 547 ₹1,33,511.76 Lowest | 563 ₹1,37,417.04 |
| 4.00 | cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete | 7.93 | Cum | 6,636 ₹52,623.48 Lowest | 6,835 ₹54,201.55 |
| 5.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. | 21.8 | Cum | 5,615 ₹1,22,407 Lowest | 5,783 ₹1,26,069.4 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to | 0.1 | MT | 91,858 ₹9,185.8 Lowest | 94,614 ₹9,461.4 |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. | 0.64 | Cum | 9,066 ₹5,802.24 Lowest | 9,338 ₹5,976.32 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 41.77 | Sqm | 282 ₹11,779.14 Lowest | 290 ₹12,113.3 |
| 9.00 | Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification | 35.55 | Sqm | 578 ₹20,547.9 Lowest | 595 ₹21,152.25 |
| 10.00 | Supplying and fixing 110m dia PVC Slotecd Pipe including cost and conveyance etc. | 18 | Mtr | 334 ₹6,012 Lowest | 344 ₹6,192 |
Tender Value
₹5.7 L
EMD Value
₹5,700
Closing Date
7 Jan 2026, 3:00 pmClosed
Block Development Officer(BP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Providing Horizontal filter with Drainage in Mudugarai to Nethapakkam Road Sirunallur Panchayat in Madhuranthagam Block Under 15th CFC (Block Panchayat Tied Grant 60 Percent fund) in this 30 percent sanitation works for the year 2025-26
2025_RDTN_637584_1
Rc.No.2676/2025/A6 AD(Pt) Dated 09.12.2025
Open Tender
Civil Works - Others
Item Rate
90 days
Mudugarai to Nethapakkam Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,700
Yes
10 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
Amount
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks
cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification
Supplying and fixing 110m dia PVC Slotecd Pipe including cost and conveyance etc.
Supplying and fixing 110m dia PVC Tee including cost and conveyance etc.
Supplying and fixing Weld Mesh 10x10cm 10 Guage including cost and conveyance etc
Supplying and fixing 110m dia PVC end cap including cost and conveyance etc
Filling the soak pit with 20mm metal as per specification
Filling the soak pit with 12mm metal as per specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RADISHKUMAR (BID ID -1555817)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_763050.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_763050.xls
BOQ • 0.32 MB
Technical.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .