Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹24,200
Closing Date
4 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA ASI Chennai Circle
O/o Superintending Archaeologist, ASI Chennai 9
TENDER FOR THE EXECUTION OF WORK TO SUPPLY, FABRICATION AND INSTALLATION OF PREFABRICATED MS PORTA CABIN WITH RAISED STONE PLATFORM BASE AT CENTRALLY PROTECTED MONUMENTS UNDER KANCHIPURAM SUB CIRCLE
2026_ASI_932368_1
T-15014/326/2026-CHENNAI CIRCLE
Open Tender
Civil Works - Buildings
Works
10 days
as per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹24,200
Yes
5 Nov 2026
30 Oct 2026
5 Nov 2026
30 Oct 2026
4 Nov 2026
30 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Making, Supply and installation of prefabricated MS portable storage cabin of size 3.60m x 2.40m x 2.60m (LBH) including base main frame made of ISMC 75x40x6 mm thick MS C-channel with additional bottom cross sections of 60x40x2 mm thick MS rectangular tube, side corner posts of 60x60x2 mm thick and top frame of 50x50x2 mm thick MS square tube, side outer walls and roof covered with 1.6 mm thick MS corrugated sheet of branded, flooring with 18 mm thick fibre cement board, lifting arrangement with 10 mm thick MS plate hooks, one number MS door of size 0.90m x 2.10m with aldrops and padlock arrangement and two numbers MS windows of size 0.90m x 0.60m with necessary fittings, including finishing with one coat of red oxide primer and two coats of enamel paint for both interior and exterior, including cost of all materials, labour, fabrication, welding, loading, unloading, transportation and placing in position at site, complete in all respects as per the direction of Engineer-in-Charge. (Location: Vaikuntaperumal koil temple,Parameswara Vinnagaram (Kanchipuram) , Piravatanesvara Temple Kanchipuram , Sri Muktesvara Swami Temple. , Kanchipuram) | 3 | 1 No | 1,76,525.42 | ₹5,29,576.26 | 18% |
| 2 | Transportation charges of ready made porto cabin from Chennai yard to work site at Kanchipuram - a lead of 70 Km by means of mechanically driven lorry / light commercial vehicle including loading at source, unloading at destination, stacking at site as directed, including all leads, lifts, fuel charges, toll charges, driver bata, all taxes, but excluding GST, complete as per direction of Engineer-in-charge. (Location: Vaikuntaperumal koil temple,Parameswara Vinnagaram (Kanchipuram) , Piravatanesvara Temple Kanchipuram , Sri Muktesvara Swami Temple. , Kanchipuram) | 3 | 1 job | 28,728.81 | ₹86,186.43 | 18% |
| 3 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m etc complete as per the direction of the site incharge.(Location: Vaikuntaperumal koil temple,Parameswara Vinnagaram (Kanchipuram) , Piravatanesvara Temple Kanchipuram , Sri Muktesvara Swami Temple. , Kanchipuram) | 8.1 | 1m3 | 214.9 | ₹1,740.69 | 18% |
| 4 | Providing and laying in position cement concrete, All work up to plinth level:Mix: 1:4:8 (1 Cement : 4 coarse sand (Zone-III) derived from natural sources : 8 graded stone aggregate 20 mm nominal size derived from natural sources) Cement concrete 1:4:48for foundation base / flooring / support pedestal for erection of Porto cabin including ramming, consolidating, leveling, curing etc., complete (Location: Vaikuntaperumal koil temple,Parameswara Vinnagaram (Kanchipuram) , Piravatanesvara Temple Kanchipuram , Sri Muktesvara Swami Temple. , Kanchipuram) | 3.9 | 1m3 | 8,063.71 | ₹31,448.47 | 18% |
| 5 | Laying new Stone platform over the base concrete to the gradetion level with cement mortar 1:4 including cost, conveyance of all materials, labour charges, loading and unloading charges etc. and also includes all applicable taxes and charges etc. complete all as directed by the department officials.(Location: Vaikuntaperumal koil temple,Parameswara Vinnagaram (Kanchipuram) , Piravatanesvara Temple Kanchipuram , Sri Muktesvara Swami Temple. , Kanchipuram) | 40.2 | 1m2 | 3,830.51 | ₹1,53,986.5 | 18% |
| 6 | Pointing the stone joints with cement mortar 1:3 including cost of all materials, labour charges, loading and unloading charges etc. complete all as directed by the department officials.(Location: Vaikuntaperumal koil temple,Parameswara Vinnagaram (Kanchipuram) , Piravatanesvara Temple Kanchipuram , Sri Muktesvara Swami Temple. , Kanchipuram) | 40.2 | 1m2 | 405.85 | ₹16,315.17 | 18% |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
tenderdocument11.pdf
Tender Documents • 21.65 MB
BOQ_979805.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .