| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹10.4 L (2.55%)Admitted-Finance | ₹4.2 Cr+₹10.4 L (2.55%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹13.5 L (3.31%)Admitted-Finance | ₹4.2 Cr+₹13.5 L (3.31%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AARVANSS BUILDWELL AND INFRACON LLP L1 | PSH TECHNO ENGG PVT LTD L2 | Jagad Electrical & Fabricators L3 |
|---|---|---|---|---|---|---|
| 1.00PART-A (SUPPLY) Fabrication, galvanizing, inspection & supply of 132 KV DC/MC Mono Pole with extension and nuts, bolts, washers & ladder etc as per design | ||||||
| 1.01 | PD 40 M (30-60) with bottom cross arm 40 m | 2 | Nos. | 51,50,000 ₹1,03,00,000 Lowest | 53,55,000 ₹1,07,10,000 | 52,50,000 ₹1,05,00,000 |
| 1.02 | PB 25 M (2-25) with bottom cross arm 25 m | 2 | Nos. | 22,50,000 ₹45,00,000 Lowest | 23,25,000 ₹46,50,000 | 23,85,000 ₹47,70,000 |
| 2.00 | Fabrication, galvanizing, inspection & supply of nuts and bolts of PB 19 M 132 KV DC Mono Pole as per design of existing erected monopole. | 2 | Nos. | 1,95,000 ₹3,90,000 Lowest | 2,50,000 ₹5,00,000 | 2,20,000 ₹4,40,000 |
| 3.00Tower Accessories | ||||||
| 3.01 | Number Plate | 6 | Nos. | 350 ₹2,100 Lowest | 400 ₹2,400 | 425 ₹2,550 |
| 3.02 | Danger Plate | 6 | Nos. | 350 ₹2,100 Lowest | 400 ₹2,400 | 425 ₹2,550 |
| 3.03 | Phase Plate in Set of Red, Blue & Yellow | 6 | Set | 1,350 ₹8,100 | 1,250 ₹7,500 Lowest | 1,450 ₹8,700 |
| 3.04 | Pipe type Earthing material | 12 | Set | 3,800 ₹45,600 | 3,600 ₹43,200 | 3,500 ₹42,000 Lowest |
| 4.00 | Supply of 24 Fibre (DWSM)OPGW Fibre Optical Cable | 2 | KM | 3,18,000 ₹6,36,000 | 3,25,000 ₹6,50,000 | 3,15,000 ₹6,30,000 Lowest |
Tender Value
₹4.1 Cr
EMD Value
₹4.1 L
Closing Date
8 Apr 2021, 3:00 pmClosed
EXECUTIVE ENGINEER
132 KV S/S LALKUAN, GHAZIABAD
works
2021_UPTCL_577505_1
E-Tender no. T-62/ETC/GZB/2020-21
Open Tender
Electrical Works
Fixed-rate
120 days
ETD-II Ghaziabad
as per documents
2 documents required · 2 mandatory
₹8,850
As per NIT
₹4.1 L
28 May 2021
27 Mar 2021
9 Apr 2021
27 Mar 2021
8 Apr 2021
27 Mar 2021
27 Mar 2021 - 6 Apr 2021
Amount
PART-A (SUPPLY) Fabrication, galvanizing, inspection & supply of 132 KV DC/MC Mono Pole with extension and nuts, bolts, washers & ladder etc as per design
PD 40 M (30-60) with bottom cross arm 40 m
PB 25 M (2-25) with bottom cross arm 25 m
Fabrication, galvanizing, inspection & supply of nuts and bolts of PB 19 M 132 KV DC Mono Pole as per design of existing erected monopole.
Tower Accessories
Number Plate
Danger Plate
Phase Plate in Set of Red, Blue & Yellow
Pipe type Earthing material
Supply of 24 Fibre (DWSM)OPGW Fibre Optical Cable
Supply of Installation Hardware set for 24 fibre (DWSM) OPGW Fibre Optical Cable including tension assembly,suspension assembly ,vibration damper,reinforcing rods,earthing clamps,down lead clamps etc but excluding joint box .One set conatin all installation hardware as may be required for 1 km of OPGW
Supply of joint box (24 Fibre)
Hardware Suitable for ACSR Panther Conductor
Single Suspension fitting
Single Tension fitting
Double Tension fitting
70 KN Polymer Insulator String
120 KN Polymer Insulator String
Vibration Dampers
Repair Sleeve
Mid Span Compretion Joint
PART B:- WORK
Survey including preparation of final tower schedule of material, marking of location etc.
Check survey & final peg marking (Route length)
Cost of excavation of 132 KV DC MONOPOLE foundation pits including all earth work, back filling and levelling etc.
Cost of concreting for all types 132 KV DC MONOPOLE foundation including cost of cement, dewatering, shuttering, & curing but excluding cost of reinforcement bars with M20/M25 mix concrete.
Cost of pilling upto 10 mtr depth including bulbs upto 600 mm dia, cost also includes laying of reinforcement & bentronite bags but excludes the cost of reinforcement & concrete.
Cost for setting & allignment of bolts along with sacrificial & normal template( Rate per location ) for following 132 KV DC monopoles.
Erection of PD (30 to 60 degree)bottom cross arm 40 mtr type of Monopole and there extensions wherever required including all work above ground level excluding hosting of insulators and hardware.
Erection of PB (2 to 25 degree)bottom cross arm 25 mtr type of Monopole and there extensions wherever required including all work above ground level excluding hosting of insulators and hardware.
Erection of PB (2 to 15 degree)bottom cross arm 19 mtr type of Monopole and there extensions wherever required including all work above ground level excluding hosting of insulators and hardware.
Tack welding of all the bolts at base plate of Monopole & first section of DC towers
Laying, tensioning, Stringing, Clamping, Jointing etc complete with ACSR Panther conductor S/C including hoisting of insulators fitting of all necessary hardware & accessories etc.
Laying , tensioning,Stringing,Clamping, jointing etc complete with OPGW including hoisting of all necessary hardware & acessories for OPGW
Grounding work including earth work for pipe type earthing.
Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting,bending,placing,binding etc
Dismantling of old 132 KV S/C Monopole & shifting back to new foundation.
Destringing of existing conductor including dismantling of insulators fitting & all necesssary hardware & accessories etc including loading and unloading at both ends.
Destringing of OPGW at existing tower
Construction of Machan for safely stringing & destringing of line
Providing barricates for avoidind any accident during the period of excavation to backfilling of soil.
Construction of Kaccha road by the help of earth filing & other things as per site requirement for smooth movement of 200 ton crane
Stringing and destringing of ACSR-Panther conductor & OPGW between section towers of a span over the EPE National Highway with the help of hot line crossing includes laying,tensioning,stringing ,clamping ,Jointing etc to complete in all respect.
Design of 132 KV D/C Monopole ,PD 40M & PB 25 M with extension nuts,bolts,washers & ladder and its foundation and PB-19 m nuts bolts and its foundation (Design of ple and its foundation .Duly approved from any of the Govt approved test lab i.e CPRI/IIT Mumbai,Delhi,Roorkee
PSH TECHNO ENGG PVT LTD
Jagad Electrical & Fabricators
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
doc62.pdf
Tender Documents • 1.93 MB
BOQ_887944.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .