| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.5 LAccepted-AOC | ₹13.5 L Quoted ₹15.0 L | 1 | Accepted-AOC AOC |
| 2 | 2₹15.4 LRejected-Finance | ₹15.4 L | 2 | Rejected-Finance Financial Evaluation |
| 3 | 3₹15.5 LRejected-Finance | ₹15.5 L | 3 | Rejected-Finance Financial Evaluation |
| 4 | Rejected-Technical | - | - | Rejected-Technical TENDER OPEN |
| Sl No | Description | Qty | Unit | The Safidon Subhash Coop L C Society L1 | The Nikhil Coop L and C Society Ltd Safidon L3 | The Safidon Laxmi Cooperative Labour & Construction Society Ltd L2 |
|---|---|---|---|---|---|---|
| 1.01 | Providing And Fixing 8 Inch PVC Pipe(Dc Rate Sr.no 226) | 1,851.52 | kg | 150 ₹2,77,728 | 165 ₹3,05,500.8 | 160 ₹2,96,243.2 |
| 1.02 | Recovery of old IPB | 7,839 | nos | 3 ₹23,517 | 3 ₹23,517 | 3 ₹23,517 |
Tender Value
₹13.5 L
EMD Value
₹27,056
Closing Date
17 Dec 2025, 9:00 amClosed
SURESH KUMAR
Municipal Committee Safidon
Construction of Street from H/o Nanu To H/o Naresh (T-point) and H/o Sandeep panchal to H/o Rohit sharma in ward no. 14 in MC Safidon.
2025_HRY_489001_1
2025DEB8004C 74A0 4E5E 893F 385A087F5EFD351ULB
Open Tender
Civil Works
180 days
Safidon
2 documents required · 2 mandatory
₹1,000
Yes
₹27,056
Yes
22 Apr 2026
10 Dec 2025
17 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
Providing And Fixing 8 Inch PVC Pipe(Dc Rate Sr.no 226)
Recovery of old IPB
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_567176.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid