Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC HARIPUR COLLIERY P O HARIPUR DIST PASCHIM BARDHAMAN PIN 713378 W B | HARIPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹4.5 L | 1 | Accepted-AOC Eligible L-1 bidder. |
| 2 | 2₹4.6 L+₹10,792.37 (2.39%)Rejected-Finance HARIPUR BARDHAMAN BARDHAMAN 713323 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713323 | ₹4.6 L+₹10,792.37 (2.39%) | 2 | Rejected-Finance Quoted more than L-1 bidder. |
| 3 | 3₹4.7 L+₹22,284.77 (4.93%)Rejected-Finance VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹4.7 L+₹22,284.77 (4.93%) | 3 | Rejected-Finance Quoted more than L-1 bidder. |
| Sl No | Description | Qty | Unit | SANJAY YADAV L1 | JAY MAA DAL DALI KALI L3 | NANTU KAZI L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01Material Cost | ||||||
| 1.02 | Supply of MS nut bolt 6/8*3" | 200 | kg | 120 ₹24,000 Lowest | 200 ₹40,000 | 150 ₹30,000 |
| 2.00Labour Cost: | ||||||
| 2.01 | Dismantling, Shifting & installation of 2000 GPM Pump motor Set with complete float assembly, 70/95 Sq mm Cable, HT Starter/ switch, NRV,Bends, Foot Valave, Gate Valves etc. | 2 | Job | 65,000 ₹1,30,000 Lowest | 65,000 ₹1,30,000 Lowest | 66,000 ₹1,32,000 |
| 2.02 | Shifting, Laying & Jointing of 8" dia MS Pipe including levelling of ground for laying of pipe on even surface (Horizontal). | 900 | mtr | 131 ₹1,17,900 | 126 ₹1,13,400 Lowest | 131 ₹1,17,900 |
| 3.00 | Shifting, Laying & Jointing of 6" dia MS Pipe (Vertical). | 140 | mtr | 263 ₹36,820 Lowest | 300 ₹42,000 | 263 ₹36,820 Lowest |
| 3.01 | Making of Rubber joint of conveyor belt as per requirement. | 200 | no | 19 ₹3,800 Lowest | 20 ₹4,000 | 19 ₹3,800 Lowest |
| 3.02 | Add Tools & tackels (labour+ Material cost) @ 10% | 1 | LS | 31,252 ₹31,252 Lowest | 32,940 ₹32,940 | 31,252 ₹32,052 |
| 4.00 | P. F. amount for labour cost | 1 | no. | 39,523.82 ₹39,523.82 Lowest | 39,841.22 ₹39,841.22 | 39,523.82 ₹39,869.9 |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
21 Feb 2026, 5:00 pmClosed
AE EnM
S.B.AREA
Dismantling, shifting and installation of 02 nos of 2000 GPM Pump motor Set with accessories and handling, laying and jointing of 8 Inch dia MS Pipe for dewatering at RVI Mid sump under S. B. Project.
2026_ECL_352813_1
GM/SBA/EnM/Tender/25-26/99
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
S.B.Project
Please refer tender document.
4 documents required · 4 mandatory
₹5,400
10 Apr 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
11 Feb 2026 - 14 Feb 2026
Item Description/ Heading
Material Cost
Supply of MS nut bolt 6/8*3"
Labour Cost:
Dismantling, Shifting & installation of 2000 GPM Pump motor Set with complete float assembly, 70/95 Sq mm Cable, HT Starter/ switch, NRV,Bends, Foot Valave, Gate Valves etc.
Shifting, Laying & Jointing of 8" dia MS Pipe including levelling of ground for laying of pipe on even surface (Horizontal).
Shifting, Laying & Jointing of 6" dia MS Pipe (Vertical).
Making of Rubber joint of conveyor belt as per requirement.
Add Tools & tackels (labour+ Material cost) @ 10%
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
technical_365707.pdf
techsummary_365707.pdf
finance_365707.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.78 MB
Tendernotice_3.pdf
PDF • 1.32 MB
BOQ_365707.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .