Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC HARIPUR COLLIERY P O HARIPUR DIST PASCHIM BARDHAMAN PIN 713378 W B | HARIPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹4.5 L | 1 | Accepted-AOC Eligible L-1 bidder. |
| 2 | 2₹4.6 LRejected-Finance HARIPUR BARDHAMAN BARDHAMAN 713323 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713323 | ₹4.6 L | 2 | Rejected-Finance Quoted more than L-1 bidder. |
| 3 | 3₹4.7 LRejected-Finance VILL P O CHINCHURIA DIST BURDWAN WB PIN 713378 | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | ₹4.7 L | 3 | Rejected-Finance Quoted more than L-1 bidder. |
| Sl No | Description | Qty | Unit | SANJAY YADAV L1 | JAY MAA DAL DALI KALI L3 | NANTU KAZI L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01Material Cost | ||||||
| 1.02 | Supply of MS nut bolt 6/8*3" | 200 | kg | 120 ₹24,000 | 200 ₹40,000 | 150 ₹30,000 |
| 2.00Labour Cost: | ||||||
| 2.01 | Dismantling, Shifting & installation of 2000 GPM Pump motor Set with complete float assembly, 70/95 Sq mm Cable, HT Starter/ switch, NRV,Bends, Foot Valave, Gate Valves etc. | 2 | Job | 65,000 ₹1.3 L | 65,000 ₹1.3 L | 66,000 ₹1.3 L |
| 2.02 | Shifting, Laying & Jointing of 8" dia MS Pipe including levelling of ground for laying of pipe on even surface (Horizontal). | 900 | mtr | 131 ₹1.2 L | 126 ₹1.1 L | 131 ₹1.2 L |
| 3.00 | Shifting, Laying & Jointing of 6" dia MS Pipe (Vertical). | 140 | mtr | 263 ₹36,820 | 300 ₹42,000 | 263 ₹36,820 |
| 3.01 | Making of Rubber joint of conveyor belt as per requirement. | 200 | no | 19 ₹3,800 | 20 ₹4,000 | 19 ₹3,800 |
| 3.02 | Add Tools & tackels (labour+ Material cost) @ 10% | 1 | LS | 31,252 ₹31,252 | 32,940 ₹32,940 | 31,252 ₹32,052 |
| 4.00 | P. F. amount for labour cost | 1 | no. | 39,523.82 ₹39,523.82 | 39,841.22 ₹39,841.22 | 39,523.82 ₹39,869.90 |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
21 Feb 2026, 5:00 pmClosed
AE EnM
S.B.AREA
Dismantling, shifting and installation of 02 nos of 2000 GPM Pump motor Set with accessories and handling, laying and jointing of 8 Inch dia MS Pipe for dewatering at RVI Mid sump under S. B. Project.
2026_ECL_352813_1
GM/SBA/EnM/Tender/25-26/99
Open Tender
Electrical and Maintenance Works
30 days
S.B.Project
Please refer tender document.
4 documents required · 4 mandatory
₹5,400
10 Apr 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
11 Feb 2026 - 14 Feb 2026
Item Description/ Heading
Material Cost
Supply of MS nut bolt 6/8*3"
Labour Cost:
Dismantling, Shifting & installation of 2000 GPM Pump motor Set with complete float assembly, 70/95 Sq mm Cable, HT Starter/ switch, NRV,Bends, Foot Valave, Gate Valves etc.
Shifting, Laying & Jointing of 8" dia MS Pipe including levelling of ground for laying of pipe on even surface (Horizontal).
Shifting, Laying & Jointing of 6" dia MS Pipe (Vertical).
Making of Rubber joint of conveyor belt as per requirement.
Add Tools & tackels (labour+ Material cost) @ 10%
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_365707.pdf
techsummary_365707.pdf
finance_365707.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.78 MB
Tendernotice_3.pdf
PDF • 1.32 MB
BOQ_365707.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid