Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹5.6 Cr+₹13.0 L (2.38%)Rejected-AOC 2 50A THINDAMANGALAM PANANKATTUR PO OMALUR SALEM 636 455 | OMALUR | SALEM | TAMIL NADU | 636455 | ₹5.6 Cr+₹13.0 L (2.38%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | KKS and Co L1 | P Paramasivam L2 |
|---|---|---|---|---|---|
| 1.00Construction of High Level Bridge at Koratti River @ Pullavedampathi H/o. Kadavani Ch 0/0-0/500 | |||||
| 2.00 | Earthwork excavation in soft rock not requirig blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 494.68 | Cum | 193 ₹95,473.24 Lowest | 197 ₹97,451.96 |
| 3.00 | Medium Rock & Dense Medium rock requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 360 | Cum | 1,153 ₹4,15,080 Lowest | 1,180 ₹4,24,800 |
| 4.00 | Blasting and removing the hard rock measured in solid in the foundation and removinga the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidential charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specification for ( OPEN FOUNDATION, CUT OFF WALL) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL | 384 | Cum | 2,051 ₹7,87,584 Lowest | 2,100 ₹8,06,400 |
| 5.00 | Vibrated Cement Concrete of grade M 15 Nominal mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below ABUTMENT, WNGS and PIERS. | 24 | Cum | 5,362 ₹1,28,688 Lowest | 5,491 ₹1,31,784 |
| 6.00 | Providing and fixing Dowel Bars with 32mm steel rods of 1.5m length embedded into the rock to a depth of 0.6m by providing required depth of holes by drilling the rock in 50mm dia wherever necessary including fixing in position by grouting the embedded portion with CM 1:2 after placing the bars. | 200 | Nos | 931 ₹1,86,200 Lowest | 953 ₹1,90,600 |
| 7.00 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for footing under ABUTMENT, WNGS and PIERS | 304.44 | Cum | 9,989 ₹30,41,051.16 Lowest | 10,230 ₹31,14,421.2 |
| 8.00 | Vibrated reinforced cement concrete M 30 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS BELOW SILL LEVEL | 59.2 | Cum | 10,374 ₹6,14,140.8 Lowest | 10,625 ₹6,29,000 |
| 9.00 | Vibrated reinforced cement concrete M 30 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL | 111.11 | cum | 11,269 ₹12,52,098.59 Lowest | 11,541 ₹12,82,320.51 |
| 10.00 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Below SILL LEVEL | 5.65 | Cum | 10,670 ₹60,285.5 Lowest | 10,927 ₹61,737.55 |
Tender Value
₹5.4 Cr
EMD Value
₹5.4 L
Closing Date
19 Aug 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT Uthangarai Block Under SSA 2025-2026 Construction of High Level Bridge at Koratti River at Pullavedampathi in Kadavani Ch 0_0 to 0_500 Panchayat Package no TN 04 155
2025_RDTN_587181_1
GO_124_RDPR_SGS_2_1_30_06_25
Open Tender
Civil Works - Bridges
Item Rate
450 days
Uthangarai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.4 L
DRDA Krishnagiri
7 Nov 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
12 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 0.47 MB
BOQ.xls
BOQ • 0.39 MB
Tenderdocument_2.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .