| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 CrAccepted-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹5.4 Cr | 1 | Accepted-AOC DUE TO LOWER SIDE |
| 2 | 2₹5.8 Cr+₹37.0 L (6.83%)Rejected-AOC H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹5.8 Cr+₹37.0 L (6.83%) | 2 | Rejected-AOC DUE TO HIGHER SIDE |
| 3 | 3₹5.8 Cr+₹43.7 L (8.08%)Rejected-AOC NEAR SHIV MANDIR VILLAGE RAJPURA KHARKARI TEHSIL AND DISTRICT BHIWANI 127031 | BHIWANI | HARYANA | 127031 | ₹5.8 Cr+₹43.7 L (8.08%) | 3 | Rejected-AOC DUE TO HIGHER SIDE |
| 4 | 4₹7.2 Cr+₹1.8 Cr (33.6%)Rejected-AOC | ₹7.2 Cr+₹1.8 Cr (33.6%) | 4 | Rejected-AOC DUE TO HIGHER SIDE |
| 5 | 5₹7.6 Cr+₹2.2 Cr (41.3%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹7.6 Cr+₹2.2 Cr (41.3%) | 5 | Rejected-AOC DUE TO HIGHER SIDE |
Tender Value
₹6.2 Cr
EMD Value
₹12.4 L
Closing Date
14 Feb 2022, 2:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION NO 2 HISAR
Const of 2 RCC SS Tank 2 RCC CWT RCC SS well PC SV Houdi Earth Filling Raising of BW Dismantling of 6 FB Const of 1 RSand Filter 1point00 MLD PM Disty System UG CWT BW PC DI specials 6inch DI Rmain OandM of WTP of 1point00 MLD 5yrs after 12 mnths def
2022_HRY_207066_1
2194 dated 04.02.2022
Open Limited
Civil Works
Works
7 days
HISAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹12.4 L
Yes
1 Apr 2022
8 Feb 2022
14 Feb 2022
8 Feb 2022
14 Feb 2022
8 Feb 2022
Amount
Construction of water purification plant of 1.00 MLD capacity SCADA based at Water Works, all other installation etc. comprising of DI pipe from existing raw water main/pump, inlet box of WTP and to CWT to C.W. suction well, inlet channel, Alum dozing, Flash mixing, Clari floculator, filter box, over head Reservoir for back wash including pump sets and electric control panel, waste water tank including pump sets and electric control panel, DI pipes, DI specials, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of floe measurement and sand bed with automation complete in all respects as per NIT (Sluice valve of make IVC/ VAG )
Supply & Erection of Horizontal spindle split casing type pumping sets of minimum Four (4) Star rating duties directly coupled to AC squirrel cage induction type motor with 1440 RPM, 3 phase, 50 Hz and accessories as described in Schedule No. II complete in all respect with priming arrangement with complete base frame. A) Raw water pump set 2 No. 600 Lpm , 12 mtr head 5.00 BHP Water Works A) Raw Water Pump Set 1800 LPM, 12.00 Mtrs. Head
Supply, erection, testing and commissioning of Wall mounted electrical panel board. fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated e deep having following items : approximate size 1200 x 900mm and 400mm a) For Raw water pump sets for 1800 Lpm x 12 M head = 2 No. AT W/W a) Main switch 100 Amp 2 No. ((L&T, Siemens, ABB) b) Volt meter 100 x 100mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) c) Amp meter 100x100mm range 0 to 100 Amp 2 No (AE/KAPPA/L&T) d) CT 100/3 Nos (AE/KAPPA/L&T) e) Vss 1 No & ASS 2 No. each of approved make f) SPP 1 No. of approved make g) motor starter, star delta, 2 No. for 1800 LPM x12 M Head Motor (L&T Siemens, AAB) h) Capacitor of suitable capacity-2 Nos i) Indicating Lamp-One set capacity = 2 No ) j) Change over switch 100 Amp = 1 No )
For Clear water pump sets for 1800 Lpm x 40 M head = 2 No. AT W/W a) Main switch 100 Amp 2 No. ((L&T, Siemens, ABB) b) Volt meler 100 x 100mm range 0 to 500 volt 2 No:(AE/KAPPA/L&T) c) Amp meter 100x100mm range 0 to 100 Amp 2 Nos(AE/KAPPA/L&T). d) CT 100/3 Nos (AE/KAPPA/L&T) e) Vss 1 No. & ASS 2 No. each of approved make f) SPP 1 No. of approved make g) Motor Starter, star delta, 2 No. for 1800 LPM x40 M Head Motor (L&T Siemens, AAB) h) Capacitor of suitable capacity-2 No i) Indicating Lamp-One set j) Change over switch 100 Amp = 2 No )
For Clear water pump sets for 600 Lpm x 30 M head = 2 No. for Boosting Station & W/W a) Main switch 63 Amp 2 No. ((L&T, Siemens, ABB) b) Volt meler 100 x 100mm range 0 to 500 volt 1 No:(AE/KAPPA/L&T) c) Amp meter 100x100mm range 0 to 100 Amp 2 Nos(AE/KAPPA/L&T). d) CT 100/3 Nos (AE/KAPPA/L&T) e) Vss 1 No. & ASS 2 No. cach of approved make f) SPP 1 No. of approved make g) motor starter, star delta, 2 No. for 600 LPM x30 M Head Motor (L&T Siemens, AAB) h) Capacetor of suitable capacity-2 No i) Indicating Lamp-One set j) Change over switch 63 Amp = 1 No )
Supply erection, testing of ISI marked copper wire for 6 Nos motors with under ground system in PVC and flexible pipes copper wine size complete in all respects with accessories like thimble etc. 6 sqm 3 core
10 sq mm 3 core
16 sqm 3 core
Providing,erection,esting of reputed make LED light 100 watts with fitting and accessories complete in all respects
Supply erection, testing of light fittings ineluding wire in the Pump Chamber with material upto 10 points including switch, button, plug. PVC conduit pipe & copper wire etc. as per approved specifications complete in respect
Less Credit of old material Bricks
Bricks Bats
Less Cerdit of old pumping machinery Raw Water = 2000 lpm 12 mtr Head
Clear Water = 2000 lpm 40 mtr Head
Operation and mantenence of WTP complete scope of work ( Distiction Material Supplied by the PHED) as per schedule - iv for a period of 5 year after 12 months during defect liability period and 3 months trial run period ( will be charged to a/mtc. estimate. Complete in all respect Operation and mantenence during defect liability period ( Operation Only ) after 3 months trial run period
For 1st Year Operation and Maintenance after defect liability period
For 2nd Year Operation and Maintenance after defect liability period
For 3rd Year Operation and Maintenance after defect liability period
For 4th Year Operation and Maintenance after defect liability period
For 5th Year Operation and Maintenance after defect liability period
Bidder Name
Amount
Ravinder Sharma Contractor(GSTN-06APJPR8270D1ZO)
M/s Vardhman Engineers and Builders(GSTN-06AAHFV1506B1ZP)
suresh kumar(GSTN-06AIPPK4333B1ZJ)
Kulbir Singh Contractor(GSTN-06ATZPS6352H1ZW)
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
suresh kumar
Kulbir Singh Contractor
M/s Vardhman Engineers and Builders
ROHTASH KUMAR CONTRACTOR
Kulbir Singh Contractor
Ravinder Sharma Contractor
M/s Vardhman Engineers and Builders
ROHTASH KUMAR CONTRACTOR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .