| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 CrAccepted-Finance AZAD NAGAR COLONY OPP GOLDEN TENTILE KHEMANI ROAD ULHASNAGAR 3 DIST THANE 421003 | ULHASNAGAR | THANE | MAHARASHTRA | 421003 | L1 | Accepted-Finance L1 | |
| 2 | L2₹21.1 Cr+₹1.0 Cr (5.11%)Rejected-Finance BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | L2 | Rejected-Finance L2 |
Tender Value
₹20.1 Cr
EMD Value
₹10.1 L
Closing Date
30 Aug 2024, 4:00 pmClosed
EXECUTIVE ENGINEER
TMC THANE
Providing laying and commissioning of gravity sewer lines and House connection work in ward no.17 (C) Kopri Panchpakhadi, Thane Municipal Corporation area
2024_TMC_1074202_1
TMC/PRO/DRAINAGE/335/2024-25
Open Tender
Civil Works
Item Rate
120 days
TMC THANE
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
₹10.1 L
TMC THANE
8 Oct 2024
22 Aug 2024
2 Sept 2024
22 Aug 2024
30 Aug 2024
22 Aug 2024
26 Aug 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc. complete. Lift 0.00 to 1.50 M | 7,646.37 | cum. | - | - |
| 2 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc. complete. Lift 1.50 to 3.00 M | 1,682.94 | cum. | - | - |
| 3 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete. -Lift 0.00 to 1.50 M | 2,879.51 | cum. | - | - |
| 4 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete. Lift 1.50 to 3.00 M | 1,949.9 | cum. | - | - |
| 5 | Excavation for foundation / pipe trenches in hard murum and boulders, WBM road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete Lift 0.00 to 1.50 M | 4,021.3 | cum. | - | - |
| 6 | Excavation for foundation / pipe trenches in hard murum and boulders, WBM road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete - Lift 1.50 to 3.00 M | 1,007.57 | cum. | - | - |
| 7 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete. Lift 0.00 to 1.50 M | 2,690.04 | cum. | - | - |
| 8 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete. Lift 1.50 to 3.00 M | 3,163.97 | cum. | - | - |
| 9 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling etc, complete. Lift 3.00 to 4.50 M | 459 | cum. | - | - |
| 10 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiseling, wedging, line drilling, by mechanical means or by any other means other than blasting, including trimming and leveling the bed by chiseling where necessary and removing the excavated material upto a distance of 50m beyond the area and lifts as below, stacking as directed by engineer-in -charge, normal dewatering excluding backfilling etc, complete by all means Lift 0.00 to 1.50 M | 1,563.32 | cum. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1874463.xls
BOQ Document • 0.35 MB
150766357.pdf
Tender Document • 0.77 MB
TD.pdf
Tender Document • 6.11 MB
150766359.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .