Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹24.2 L+₹18.5 L (319.9%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹45.6 L+₹39.9 L (691.4%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹49.7 L+₹44.0 L (762.1%)Accepted-Finance | L4 | Accepted-Finance Accepted | |
| 5 | L5₹66.5 L+₹60.7 L (1052.0%)Accepted-Finance | L5 | Accepted-Finance Accepted |
Tender Value
Refer Docs
Closing Date
4 Jan 2024, 5:00 pmClosed
Executive Engineer
Executive Engineer Provincial Division PWD BandR Branch Faridabad
Preparation of Detailed Project Report of Development of Faridabad Noida FNG 6 Lane corridor alignment and Including major bridge over River Yamuna connecting sector 168 and 167 A Noida with Sector 89 via Lalpur village in District Faridabad
2023_HRY_333913_1
9614-9663
Open Tender
Civil Works
EOI
300 days
Faridabad Noida Gaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
Exempted
Gurugram
26 Feb 2024
6 Dec 2023
4 Jan 2024
6 Dec 2023
4 Jan 2024
6 Dec 2023
6 Dec 2023 - 4 Jan 2024
14 Dec 2023
Amount
Professional Staff
Team Leader cum Resident Engineer cum Highway Engineer
Senior Bridge Engineer
Highway and Pavement Engineer
Material-cum-Geotechnical Engineer-Geologist
Senior Survey Engineer
Traffic and safety Expert
Environmental Specialist
Land Acquisition Expert
Quantity Surveyor/ Documentation Expert
Utility Expert
Sub Professional Staff
To be assessed by consultant as per requirment (LS)
Support-Staff Office manager
Typist
Office Boy
III. Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run Mahindra Bolero or equivalent(Registration date to be after 01.07.2023)
V,VI & VII.:- Office Rent, Office Supplies, Utilities, Communication, Office Furniture and Equipment (Fixed Costs)– Minimum 200sqm area of office shall be rented. The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visit or chairs, steel almirahs, computer furniture. Photocopier (15 ppm, 12000 copies per month with A3 &A 4 input), PCs (4No.), Intel Core 2 Duo E8300 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc. AC (4 no.,1.5 Ton),Water Cooler (as required)etc. The cost should include computer running cost and office/drafting supplies as well.
VIII. Reports and Document Printing Monthly Reports
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft notifications for land acquisition(3 copies each)
LA & Clearances II Report
IX. Survey and Investigation A. Topographical Survey (Fixed Cost) Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile/aerial LiDAR or better technology
B. Investigation (Fixed cost) Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey / Studies
Land Acquisition Studies
Any other investigations / surveys
Sub-Soil Investigation (Boring in all type of soil) 1500 mtr for all type of soil (other than rock) soil and 200 mrt for hard rock
C. Net Work Survey and GPR Net work Survey of the existing Highways as are pository for civil work as per directions from Authority.
GPR Survey for detection of under-ground utilities
X. Cost of supply and Fixing Boundary Pillar Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC: 25, 1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50m interval. (lumpsum)
XI Land Acquisition Team including support staff and logistics/transportation A Land acquisition Team including support staff Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
B Logistics for Land acquisition Team: Computer including necessary peripherals
Printers
VKS Infratech Management Pvt. Ltd.
Casta Engineers Pvt. Ltd.
Theme Engineering Services Pvt. Ltd.
HOLTEC CONSULTING PRIVATE LIMITED
RITES Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .