Loading…
Loading…
Tender Value
₹3.6 L
EMD Value
₹7,300
Closing Date
29 Sept 2026, 6:00 pm2d left
xen rew udhampur
xen rew udhampur
NIT
2026_RDPR_325451_9
e.NIT No. 188 REW UDHAMPUR of 2026.27 Dated 21-09-2026
Open Tender
Civil Works
Percentage
60 days
udhampur
BOQ
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹7,300
22 Sept 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. (in-stretches). | 1.81 | cum | 479.3 | ₹867.53 |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 7 | cum | 4,826.5 | ₹33,785.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. | 10 | cum | 5,733.6 | ₹57,336 |
| 4 | Structural Steel Work In Built IN TUBULAR SECTIONup sections,truses and framed work including cutting hoisting ,fixing in position and applying apriming coat of approved steel primer all complete. | 350 | kg | 156.95 | ₹54,932.5 |
| 5 | P/L IN POSITION CHEQUERED TILE | 56 | SQM | 1,150 | ₹64,400 |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Edges of slab | 62.45 | cum | 286.35 | ₹17,882.56 |
| 7 | P/F C.G.I SHEETROOFING INCLUDING VERTICAL /CURVED SURFACE WITH POLYMER COATED J OR L HOOKS ,BOLTS &NUTS 8MM DIA.WITH BITUMIN &G.ILIMPET WASHERS OR WITH G.I LIMPET WASHERSFILLED WITH WHITE LEAD,INCLUDING ACOAT OF APPROVEDSTEEL PRIMR ANDV TWO COATS OF APPROVED PAINTON OVERLAPPING OF SHEETS COMPLETEANY PITCH HORIZONTAL/VERTICALEXCLUDING THE COST OF PURLIN ,RAFTER &TRUSES&INCLUDING CUTTINGTO SIZE &SHAPE WHWEREEVER0.50MM THICKWITH ZINC COATING | 60 | SQM | 852.5 | ₹51,150 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes ANGLE 50mmX50mmX5mm | 550 | KG | 138.2 | ₹76,010 |
| 9 | Add cost of CIB | 1 | no. | 3,000 | ₹3,000 |
| 10 | Carriage of construction material | 4.5 | cum | 465.14 | ₹2,093.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1100020.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .