| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 CrAccepted-AOC | ₹2.7 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.7 Cr+₹1.7 L (0.64%)Rejected-AOC | ₹2.7 Cr+₹1.7 L (0.64%) | 2 | Rejected-AOC L2 |
| 3 | 3₹3.2 Cr+₹52.3 L (19.7%)Rejected-AOC | ₹3.2 Cr+₹52.3 L (19.7%) | 3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents are not as per NIT Requirements |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
27 Jan 2023, 6:55 pmClosed
Executive Engineer, RCC Upper Division Kathua
Executive Engineer, RCC Upper Division Kathua
Remodeling and Modernization from RD 8300 to 14312 M including allied structures at places (Part -1) (B)
2022_IFC_199029_1
e-Nit No 32/RCC Upper/RTIC Kathua 2022-23
Open Tender
Civil Works - Canal
Item Rate
180 days
Kathua
As per NIT
4 documents required · 4 mandatory
₹10,000
Executive Engineer, RCC Upper Division Kathua
₹7.2 L
Kathua
1 Mar 2023
9 Dec 2022
28 Jan 2023
10 Dec 2022
27 Jan 2023
26 Dec 2022
10 Dec 2022 - 24 Dec 2022
26 Dec 2022
Amount
Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30 cm measured at a height of 1 M above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals, inclusive of initial lead and lift(50M and 1.5m respectively a/Dry
Demolishing cement concrete manually/ by Mechanical means including disposal of material within 50 mtr. lead as per direction of engineer -in –charge 1:3:6 or richer mix .
Earthwork in excavation by manual means in tranches for foundation, drains, pipes, cables etc (not exceeding in 1.5M in width) and for shafts, bells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5M, including getting out excavated earth and disposal of surplus excavated earth as directed (1M from cutting edge) All kinds of soil
Extra for every additional lift of 1.5Mtr.or part thereof in excavation /banking excavated or stacked material All Kinds of soil (2Lifts)
Providing and laying in-situ concrete lining using M-10 nominal mix concrete(max. size of aggregates 20mm nominal )
In beds
In side slopes, up to a height of 3.5m above bed
Filling expansion joints (12mm wide ) with special Impervious hot - pour
Curing canal lining for 28days
In beds
In side slopes
Extra towards allowance for scaffolding
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level with 1:3:6(1cement:3 coarse sand:6 graded stone aggregate 20mm nominal size
Filling available excavated earth(excluding rock) in trenches plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each de-posited layer by ramming and watering lead up to 50m and lift up to 1.5 M( deduct watering and ramming)
Centering and shuttering including strutting, propping etc. and removal of from work for:- a/Foundations, footings, bases of columns etc for mass concrete
Carriage of sand and stone aggregates below 40mm average distance 12 KM by MT from source to site of work
M/s Sujan Singh
KAPAHI CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .