| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 L+₹58,420 (17.5%)Admitted-Finance KHADIA BAZAR POST YOGICHAURA SHAKTINAGAR KHADIA SHAKTINAGAR SONBHADRA UTTAR PRADESH 231222 | SONBHADRA | UTTAR PRADESH | 231222 | ₹3.9 L+₹58,420 (17.5%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY REJECTED |
| Sl No | Description | Qty | Unit | UMESH ENTERPRISES L1 | PUJA WELDING AND HARDWARE STORE L2 |
|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc. 1. Complete cleaning of fairlead and Drag pulley. 2. Making platform/stand for rebuilding of fair lead pulley. 3. Making platform/stand for rebuilding of Drag pulley. 4. Template making according to pulley profile. 5. MS plate (10mm) cutting according to template for side rebuilding of pulley. 6. Pulley groove filling according to original profile. 7. Repairing and rebuilding of fair lead pulley and Drag pulley. 8. Grinding all pulleys for original shaping. Note: The maximum deployment of manpower for the above job will be as 1. Skilled fitter for 148 nos. manshifts 2. Skilled Welder for 236 nos. manshifts. 3. Semi-Skilled for 156 nos. manshifts and 4. Un- Skilled for 08 nos. manshifts. # Work to be completed within 24 days after handing over the job. | |||||
| 1.10 | Labour charges for Complete cleaning of fairlead pulley and drag pulley area including contractor's profit. | 1 | Job | 10,000 ₹10,000 Lowest | 18,500 ₹18,500 |
| 1.20 | Labour charges for Making of platforms/stands for rebuilding of 04 fairlead pulleys including contractor's profit. | 1 | Job | 82,000 ₹82,000 | 75,100 ₹75,100 Lowest |
| 1.30 | Labour charges for Making of platforms/stands for rebuilding of 04 nos. drag pulleys (parallel activity with B.) including contractor's profit. | 1 | Job | 82,000 ₹82,000 | 76,000 ₹76,000 Lowest |
| 1.40 | Labour charges for Rebuilding of worn out 08 nos. Fairlead pulleys and 04 nos. Drag pulleys including contractor's profit. | 1 | Job | 1,30,000 ₹1,30,000 Lowest | 1,88,900 ₹1,88,900 |
| 2.00Hiring Charges | |||||
| 2.10 | Charges of Welding Machine, Note: 04 nos. Machines per day | 84 | Nos. | 150 ₹12,600 Lowest | 180 ₹15,120 |
| 2.20 | Charges of Gas Cutting set Note: 02 nos.Sets per day | 42 | Nos. | 150 ₹6,300 | 130 ₹5,460 Lowest |
| 2.30 | Charges of Grinding Machine Note: 02 nos.Machines per day | 42 | Nos. | 150 ₹6,300 | 120 ₹5,040 Lowest |
| 2.40 | Charges of Grinding wheel | 100 | Nos. | 50 ₹5,000 Lowest | 85 ₹8,500 |
Tender Value
₹5.6 L
EMD Value
₹7,100
Closing Date
21 Apr 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.-231222
Repairing OR Re-building of 04 nos. Fairlead pulleys and 04 nos. Drag pulleys of both 20by90 Dragline and 04 nos. Fairlead pulleys of 33by72 Dragline of Khadia Project.
2026_NCL_358165_1
KHD/G.M. (Excv)/E-Tender/26-27/26
Open Tender
Excavation Department Work
Item Rate
24 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,100
13 Jul 2026
8 Apr 2026
22 Apr 2026
8 Apr 2026
21 Apr 2026
9 Apr 2026
8 Apr 2026 - 16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Scope of Work/Technical Specifications etc. 1. Complete cleaning of fairlead and Drag pulley.
2. Making platform/stand for rebuilding of fair lead pulley.
3. Making platform/stand for rebuilding of Drag pulley.
4. Template making according to pulley profile.
5. MS plate (10mm) cutting according to template for side rebuilding of pulley.
6. Pulley groove filling according to original profile.
7. Repairing and rebuilding of fair lead pulley and Drag pulley.
8. Grinding all pulleys for original shaping.
Note: The maximum deployment of manpower for the above job will be as 1. Skilled fitter for 148 nos. manshifts 2. Skilled Welder for 236 nos. manshifts. 3. Semi-Skilled for 156 nos. manshifts and 4. Un- Skilled for 08 nos. manshifts.
# Work to be completed within 24 days after handing over the job. | - | - | - | - |
| - | Labour charges for Complete cleaning of fairlead pulley and drag pulley area including contractor's profit. | - | Job | - | - |
| - | Labour charges for Making of platforms/stands for rebuilding of 04 fairlead pulleys including contractor's profit. | - | Job | - | - |
| - | Labour charges for Making of platforms/stands for rebuilding of 04 nos. drag pulleys (parallel activity with B.) including contractor's profit. | - | Job | - | - |
| - | Labour charges for Rebuilding of worn out 08 nos. Fairlead pulleys and 04 nos. Drag pulleys including contractor's profit. | - | Job | - | - |
| - | Hiring Charges | - | - | - | - |
| - | Charges of Welding Machine, Note: 04 nos. Machines per day | - | Nos. | - | - |
| - | Charges of Gas Cutting set Note: 02 nos.Sets per day | - | Nos. | - | - |
| - | Charges of Grinding Machine Note: 02 nos.Machines per day | - | Nos. | - | - |
| - | Charges of Grinding wheel | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.23 MB
ITB.pdf
Tender Documents • 0.38 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
Annexures.pdf
Tender Documents • 0.80 MB
BOQ_371044.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .