Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹95,895
Closing Date
27 Aug 2026, 3:00 pm3d left
EE(NS), ALHW, Sri Vijaya Puram
O/o Deputy CHhief Engineer (Andaman), Executive Engineer (NS),ALHW,Sri Vijaya Puram
Construction of a new store room behind the Silver Jubilee Building Cell Complex and construction of a catering kitchen behind the Environment laboratory for the ALHW Multipurpose Hall at Sri Vijaya Puram
2026_ALHW_921245_1
Construction of a new store room behind the Silver Jubilee Building Cell Complex and construction of
Open Tender
Civil Works
Item Rate
180 days
Sri Vijaya Puram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹95,895
11 Aug 2026
11 Aug 2026
28 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
12 Aug 2026 - 26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work Excavation in foundation trenches in saturated soil for column and plinth etc, in all type of soil with a lead up to 100 mtr and lift up to 1.5 mtr including stacking the excavted earth not more than 3 mtr from the edge of excavation and then returning the stacked soil in 15 cm layers when required in plinths and sides of the foundation, etc, including cost of all labour charges, minor tools, GST,LWC etc, complete. | |||||
| 2 | Supplying and filling in plinth with Quarry dust under floors including, watering , rammimg consolidating and dressing including quarry dust, cost of transportation charges of all material to work site, all labour charges, GST, LWC, minnor tools etc, complete. | 21 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (one cement, three mainland river sand and six stone metal of 40mm size of local quarry) for below footing, plinth beam, etc as directed by the EIC, including cost of nominal centering & shuttering charges, cost of cement, mainland river sand, stone metal, screening & washing of both the aggregate, mixing, placing, curing, GST,LWC,etc,complete. | 21 | Cum | - | - |
| 4 | Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc, and removal of the same from reinforced cement concrete and plain concrete work as directed by the EIC, including cost of centering and shuttering, all LWC, GST, cost of binding materials, cost of transportation charges of all material to work site, cost of ballies, cost of minor tools, etc, complete. | 122 | Sqm | - | - |
| 5 | Providing and laying RCC 1:1.5:3 with 20mm size stone chips (one cement, one and half mainland river sand & three stone chips of size 2 cm graded) in all RCC works as directed by the EIC, including cost of cement, stone chips and mainland river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator, curing, all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST, LWC etc,complete. | 25 | Cum | - | - |
| 6 | Providing and fixing Tor steel reinforcement for RCC work including cutting, bending, bindingand placing in position cost of binding wire, minor tools etc, complete. The rate is inclusive of consumable items and GST & LWC., etc. complete.. | 25 | Qtl. | - | - |
| 7 | Providing and laying damp-proof course 40mm thick with cement concrete1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) as directed by the EIC including cost of all labour charges, transportation charges of all materials to work site, cost of minor tools ,GST, LWC etc,complete. | 144 | Sqm | - | - |
| 8 | Providing and fixig 20 cm thick masonry with hollow block size 0.40x0.20x0.20cm cast with cement concrete 1:3:6 (1 cement, 3 Pulverised sand and 6 11.12mm local quarry stone chips) curing with 1:4 in walls, including cost of pulverised sand, all labour charges for casting, curing, walling, hire charges of hollow block casting machine, cost of timber pallets, including cost of cement transportation charges of all materials to worksite, all labour charges minor tools, LWC, GST, etc complete. | 12 | Cum | - | - |
| 9 | Providing and laying 12mm cement plaster of mix 1:4 (1 cement, 4 mainland river sand) including cost of cement, river sand, all labour charges, cost of minor tools, transportation charges, scaffolding charges, GST, LWC etc, complete. | 167 | Sqm | - | - |
| 10Steel work in built-up Galvanized Iron (GI) tubular trusses including cutting, bending, drilling, welding, hoisting and fixing in position, complete as per approved drawings and specifications, including provision of bolts, nuts, washers (including special shaped washers) and all fittings, and applying a priming coat of approved steel primer where required. The work also includes all labour charges, cost of minor tools and plants, transportation, scaffolding, fabrication and erection, GST, labour welfare cess (LWC) etc., complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_968132.xls
BOQ • 0.29 MB
tender12.pdf
Tender Documents • 23.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].