OFFICE OF THE CHIEF ENGINEER WW THROUGH EE EnM HP-I DELHI JAL BOARD GOVT OF NCT OF DELHI HAIDERPUR WATER WORKS DELHI 110085
Renovation of HT capacitors for motors at North Pump House at CWPH, HP I.
2022_DJB_215255_8
NIT 21
Open Tender
Miscellaneous Works
Works
120 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹12,700
4 Feb 2022
22 Jan 2022
29 Jan 2022
22 Jan 2022
29 Jan 2022
22 Jan 2022
Dismantling of existing faulty Fuses and capacitor unit from static capacitor bank including removing all termination from HT system and removing other hardware with complying all safety precaution as required at site for HT work.
Supply of 3.3 KV HT, 200 kVar of 3 phase ,50 HZ capacitor for static capacitor bank. (AS PER EXISTING SAMPLE) Dimension for the Capacitor would be as per existing mounting capacitor and as per sample of capacitor bank suitable for motor capacity such as 500HP,575 HP,450 HP. The capacitor would include all necessary mounting structure cable terminals thimbles and other required hardware complete in all respects required at site.
Supply of 80A, 3.3 kV HRC fuse complete with mounting links and hardware suitable for fixing on existing capacitor bank without damaging the structure as required at site Make – Eswari/Standard
Fixing of capacitor with fuses (For 3 nos. motor) in structure with all terminals connections and other hardware items for proper functioning of system including earthing etc. as required at site including Checking of fuses and replacing faulty fuses in motors at north house
Testing & commissioning of all capacitor bank as per required parameters including following i. Continuity and earth test ii. Meggering of all equipment for phase to phase and phase to earth. iii. Checking of tightness of all nut and bolts iv. Maintaining of power factor 0.98 and above for one year
Premier Engineering Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .