Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
27 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DFO Basohli
DFO BASOHLI
Please refer BOQ and NIT Document
2026_FD_328541_1
30 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Dharkore
Please refer BOQ and NIT Document
2 documents required · 2 mandatory
₹600
0406 Forest Revenue
₹3,000
Yes
17 Oct 2026
17 Oct 2026
28 Oct 2026
17 Oct 2026
27 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 4.5 | Cum | 479.3 | ₹2,157.81 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40mm
nominal size) Crushed | 1.21 | Cum | 4,826.5 | ₹5,815.93 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 1.97 | Cum | 5,673.4 | ₹11,165.25 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | 0.68 | Cum | 6,857.45 | ₹4,676.78 |
| 5 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) | 2.32 | Sqm | 541.7 | ₹1,258.37 |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 5.2 | Sqm | 416.5 | ₹2,167.47 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 14.22 | Sqm | 286.35 | ₹4,071.61 |
| 8 | 15mm Cement plaster mix: 1 : 6 ( 1 cement : 6 fine sand) | 11.9 | Sqm | 306.85 | ₹3,650.29 |
| 9 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.
Welded | 330 | Kg | 138.2 | ₹45,606 |
| 10 | Providing corrugated G. S. sheet roofing including vertical/curved surface
fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with
bitumen and G.I limpet washers or with G.I. limpet washers filled with
white lead, including a coat of approved steel primer and two coats of
approved paint on overlapping of sheets complete (upto any pitch in
horizontal/vertical or curved surface)excluding the cost of purlins, rafters
and trusses and including cutting to size and shape wherever required.
12.1.5 0.63 mm thick with zinc coating not less than 275 gram/m2 | 9.29 | Sqm | 974.05 | ₹9,052.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_1112386.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .