SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1178298_1
12/SE-1/2026-27
Open Tender
Civil Works
Piece-work
180 days
Murad Nagar Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹12.4 L
Office of SE 1st IWC Meerut
20 Aug 2026
20 Aug 2026
29 Aug 2026
20 Aug 2026
29 Aug 2026
20 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhund from canal with its proper disposal as per direction of Engineer-in-Charge. | 3,267 | Nos. | - | - |
| 2 | Earth Work in Clearance of internal section of canal, in all type of soil, with all lift and lead, the earth from clearance to be used in strenthening of canal banks, daula etc. with its proper ramming and dressing and surplus earth shall be disposed off as spoil banks in outer side of canal banks, including all cost of T&P , labour etc complete as per direction of Engineer in charge. | 7,776.08 | cu.m | - | - |
| 3 | Dismantling brick work or stone work and cement concrete in cement mortar and inlcuding stacking of material with in a distance of 60 M as per direction of Engineer-in-Charge. | 288.31 | cu.m | - | - |
| 4 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 1,359.34 | cu.m | - | - |
| 5 | Providing and filling local sand on ghat with its ramming, dressing, compaction etc including all cost of material, labour and T&P etc required for proper completion of work. | 718.09 | cu.m | - | - |
| 6 | Providing and laying Cement concrete with 25-40 mm size aggregate M-10 (1:3:6) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 210.21 | cu.m | - | - |
| 7 | Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work etc. | 526.74 | sq.m | - | - |
| 8 | Providing and laying Reinforcement Cement concrete with 10-20 mm size aggregate M-25 (1:1:2) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 1,400.79 | cu.m | - | - |
| 9 | Providing and laying Reinforcement Fe 550 (SAIL/TATA/ ZINDALetc.) in cutting, bending, binding, welding and placing in Position inculiding all cost of material, labour and T&P etc. required for proper completion of work as per directed by engineer-in-charge. | 65.15 | M.T | - | - |
| 10 | Providing and Fixing Centering and shuttering of R.C.C. work including cost of all material, labour and T&P required for proper completion of work for slab, lintels, sun shades, columns & walls etc. as directed by engineer-in-charge. | 2,387 | sq.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.08 MB
TDUpload.pdf
Tender Documents • 6.87 MB
BOQ_2214187.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].