| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC WZ 831 NANGAL RAYA PANKHA ROAD NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹30.8 L+₹4.5 L (17.3%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L2 | Rejected-Finance Other than lowest | |
| 3 | Rejected-Technical H NO 90 VILLAGE REWLA KHANPUR PO NAJAFGARH NEW DELHI 110043 | NEW DELHI | WEST DELHI | DELHI | 110043 | - | Rejected-Technical No, Slow Progress | |
| 4 | Rejected-Technical | - | Rejected-Technical No, Slow Progress |
Tender Value
₹43.5 L
EMD Value
₹87,040
Closing Date
25 Oct 2022, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
COMPREHENSIVE MAINTENANCE OF ELECTRICAL PASSENGER LIFTS INSTALLED AT TIGRIS ROAD (BLOCK NO. 29 TO 35), KIRBY PLACE (BLOCK NO. 84 TO 86), SHORT RANGE (BLOCK NO 174 TO 178), OTM ACCN DGBR AND DCN PALAM UNDER GE(U) PM DELHI CANTT-10
2022_MES_554666_1
GE(U)/PM/D-42/2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
DELHI CANTT-10
MES contractor enlisted under class D category c(ii) having deposited standing security of Rs 100000 with department. Contractor not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
6 documents required · 6 mandatory
₹500
Yes
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
₹87,040
Yes
19 Nov 2022
27 Sept 2022
27 Oct 2022
27 Sept 2022
25 Oct 2022
11 Oct 2022
Amount
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM of existing lifts i.e M/S TK Elevator India PVt Ltd (Formerly known as Thyssenkrupp Elevator India Pvt Ltd) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Eight floor i.e total Nine landings with electric power operated doors, auto electric levelling device installed complete all as specified and directed . Tigris Road Block No 29 to 35 (08 &13 passenger lift) = 14 Nos Lifts Make - ThyssenKrupp Total Qty = 14 x 11 Months = 154
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM of existing lifts i.e M/S TK Elevator India PVt Ltd (Formerly known as Thyssenkrupp Elevator India Pvt Ltd) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Eight floor i.e total Nine landings with electric power operated doors, auto electric levelling device installed complete all as specified and directed . Short Range Block No 174 to 178 (08 &13 passenger lift) = 10 Nos Lifts Make - ThyssenKrupp Total Qty = 10 x 11 Months = 110
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM of existing lifts i.e M/S TK Elevator India PVt Ltd (Formerly known as Thyssenkrupp Elevator India Pvt Ltd) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Six floor i.e total Seven landings with electric power operated doors, auto electric levelling device installed complete all as specified and directed . Kirby Place Block No 85 to 87 (08 &13 passenger lift) = 06 Nos Lifts Make - ThyssenKrupp Total Qty = 06 x 11 Months = 66
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM of existing lifts i.e M/S TK Elevator India PVt Ltd (Formerly known as Thyssenkrupp Elevator India Pvt Ltd) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device installed complete all as specified and directed. OTM Accn DGBR Bldg No P-12 (08 passenger lift) (Total lifts = 02 Nos) Make - ThyssenKrupp Total Qty = 02 x 11 Months = 22
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM of existing lifts i.e M/S TK Elevator India PVt Ltd (Formerly known as Thyssenkrupp Elevator India Pvt Ltd) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Four floor i.e total Five landings with electric power operated doors, auto electric levelling device installed complete all as specified and directed. OTM Accn DGBR Bldg No P-15 (08 passenger lift) (Total lifts -02 Nos) Make - ThyssenKrupp Total Qty = 02 x 11 Months = 22
Comprehensive maintenance of 01 No of Goods Lift of Capacity 2500 kg installed at DCN Palam(AF) in reliable safe and efficient operating condition through MOU with OEM of existing lifts i.e M/S TK Elevator India PVt Ltd (Formerly known as Thyssenkrupp Elevator India Pvt Ltd) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Basement+ Ground + 2 floors (total 04 landings)with electric power operated doors, auto electric levelling device installed complete all as specified and directed . (DCN Palam : 01 No Lift) Make - ThyssenKrupp Total Qty = 01 x 11 Months = 11
Note for item No 1 to 6. (i) The full comprehensive maintenance (Platinum Agreement for M/s TKE India Pvt Ltd.) shall be done through OEM of existing lifts i.e. of M/s Thyssenkrupp Elevator India Pvt Ltd. i.e. M/s TKE India Pvt Ltd. (ii) The contractor will have to submit MOU on stamp paper of Rs 100/- duly notarized, as per specified Performa given on page No 97 to 99 from respective OEM of existing lifts i.e of M/s Thyssenkrupp Elevator India Pvt Ltd. i.e. M/s TKE India Pvt Ltd. within Twenty Eight days from date of Acceptance of tender. If the delay from OEM side to submit the MoU, the contractor to be submit evidence to the Accepting Officer and permission to be obtained from Accepting Officer for delay in submission of MoU. (iii) Contractor will conclude AMC with OEM (TK Elevator India PVT Ltd(TKE)(Formerly known as Thyssenkrupp Elevator India Pvt Ltd)Platinum agreement and copy of the agreement along with Tax invoice will be submitted to Engineer-in-Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC agreement. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as required for smooth and efficient functioning of the equipment/lift. (v) The Contract included of repair replacement of machines, motors, ropes, inverter/ARD system(Including replacement of new battery) , controller parts, PCBs, belts, rollers, gears,bearings,solenoids,coils,chock brake shoes, liners, contactors, relays, coils, pushbuttons, door operator VVF drive,VVVF main drive,cardoor safety device limit switches,governor,hoistway door locks,cabin fan /blower, indicators and other minor machanical parts. The cost of above material are deemed to be included in the rates quoted by the contractor. (vi) The following items are not included like replacement of car cabin, ceiling frames, panels, and fixtures, hoist way door panels, door frames, sills, car flooring, floor covering, lighting fixtures, ceiling light bulbs and tube, main line power switches, breakers, feeders to controller, hoist way wiring, hydralic jack outer casing, burried piping, alignment of elevator guide rails,smoke and fire sensors, communication devises, security systems, landing doors,sheave rim & hoist rope.
Note for item No 1 to 6. (vii) Lift cabin light fitting issued under sch 'B' free for fixing only. (viii) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor, or all as per direction of Engr-in-Charge. (ix) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge and contractor has to submit earthing test report sheet. (x) Contractor to be submit Safety Security certificate of lifts from OEM and performance certificate of lifts from User (RWA/DOERA) in every month and also contractor to submit lights and fan servicibility of lifts and machin room every month on written. (xi) TheOEM will also detail one technician staff to inspect the lift every week regarding functioning of lifts or any other issues arisingin the lift. The problem noticed if any to be informed immediatly to JE E/M / Engr-in-Charge.Incase no technician detailed Rs.500/- per week per lift will be deducted from conctractors dues. Technician should always carry service tools during site visit in every week. (xii) Monthly maintenance check will be carried out by OEM as per monthly maintenance check list mentioned in Particular specification here-in -after. (xiii) Retreived items are property of OEM.
M/s Dhapola Elevator and Engineering
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .