Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | ₹1.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 LRejected-AOC | ₹1.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JEFI ENTERPRISES L1 | KEERTHANA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for unloading counterweight (5-15 ton) from counterweight box arranging chain block and belt clamps, lifting counterweight box to the required level and after completion of belt joint work, releasing the counterweight box loading the counterweight in the conveyor. Assembling of belt drum stand with necessary supports and stiffness providing at conveyor take up area and unloading the drum in the stand. Decoupling the gear coupling, removal of skirt board rubbers and clamps from the conveyor head and tail ends for the free movement of belt while pulling by manually and reassembling the same after completion of work. Uncoiling the belt and laying the belt about 196 meters by using chain block & pull lift arrangements and pulling the belt through wire rope in step by step manner inspecting every wire rope sliding points and conveyor belts. Removing the carrying and return idlers, clampings the belt on conveyor bottom side 2 sets and top side 2 sets to arrest the belt and removing the clamps on conveyor bottom and top side after completion of work. Making preliminary arrangements for providing 1 st, 2nd belt joints and assisting the belt joint works and other allied works. Arresting the belt after laying by using belt arresting clamps at 4 locations and allied works. Trial running the conveyor on 'no load and 'load condition' to check the movement of counterweight, belt sway and carrying the belt tracking work. Cutting and removing the wornout belt from the conveyor and devoluted to stores and allied works including hire charges for T&Ps cost of consumbles required for this work etc., complete. | 1 | Operation | 1,15,000 ₹1,35,700 Lowest | 1,30,000 ₹1,53,400 |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
17 Mar 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I-Replacement of 196 mtrs. length worn out belt by a second hand belt of 1800mm width belt in the Conveyor-47
2026_EB_669592_1
CE/TTPS/SE/MI/219/2025-2026
Open Tender
Miscellaneous Works
Works
5 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,200
29 Jul 2026
3 Mar 2026
18 Mar 2026
3 Mar 2026
17 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for unloading counterweight (5-15 ton) from counterweight box arranging chain block and belt clamps, lifting counterweight box to the required level and after completion of belt joint work, releasing the counterweight box loading the counterweight in the conveyor. Assembling of belt drum stand with necessary supports and stiffness providing at conveyor take up area and unloading the drum in the stand. Decoupling the gear coupling, removal of skirt board rubbers and clamps from the conveyor head and tail ends for the free movement of belt while pulling by manually and reassembling the same after completion of work. Uncoiling the belt and laying the belt about 196 meters by using chain block & pull lift arrangements and pulling the belt through wire rope in step by step manner inspecting every wire rope sliding points and conveyor belts. Removing the carrying and return idlers, clampings the belt on conveyor bottom side 2 sets and top side 2 sets to arrest the belt and removing the clamps on conveyor bottom and top side after completion of work. Making preliminary arrangements for providing 1 st, 2nd belt joints and assisting the belt joint works and other allied works. Arresting the belt after laying by using belt arresting clamps at 4 locations and allied works. Trial running the conveyor on 'no load and 'load condition' to check the movement of counterweight, belt sway and carrying the belt tracking work. Cutting and removing the wornout belt from the conveyor and devoluted to stores and allied works including hire charges for T&Ps cost of consumbles required for this work etc., complete. | 1 | Operation | 55 | ₹55 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_804765.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].