Construction of MINI CSC Building (For Boys) at Kaarapalayam PUE School H/O Vadachinaripalayam
2026_RDTN_701431_10
2819/2026/A11 SBM 26-27
Open Tender
Civil Works
Works
180 days
Kundadam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
Block Development Office (VP) Kundadam
15 Oct 2026
4 Sept 2026
15 Oct 2026
4 Sept 2026
15 Oct 2026
4 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of MINI CSC Building (For Boys) at Kaarapalayam PUE School H/O Vadachinaripalayam | 1 | nos | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 15.77 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 5.44 | cum | - | - |
| 4 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.i) Below Ground Level | 14.03 | cum | - | - |
| 5 | ii) Above Ground Level | 11.39 | cum | - | - |
| 6 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc., i) Below Ground Level | 4.43 | Sqm | - | - |
| 7 | ii) Above Ground Level | 16.55 | Sqm | - | - |
| 8 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as
directed by the departmental officers. The coarse and fine aggregates to be used should comply with
the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 3.7 | cum | - | - |
| 9 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 0.38 | MT | - | - |
| 10 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got
approved by the Executive Engineer before use on work | 20.65 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
tendernotice.pdf
Additional Documents • 2.31 MB
BOQ_843232.xls
BOQ • 0.30 MB
TB.pdf
Tender Documents • 3.22 MB
sbmtenderextension.pdf
PDF • 1.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .